IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,063

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0178 # 09 Y:2004 09 2004 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,371 $0 Not Implemented
LE0178 # 10 Y:2004 10 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $761 $0 Not Implemented
LE0178 # 11 Y:2004 11 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $702 $0 Not Implemented
LE0178 # 12 Y:2004 12 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $505 $0 Not Implemented
WV0278 # 01 Y:2003 01 2003 RECOVER AND REUSE WASTE MATERIAL $81,748 $300,000 Not Implemented
WV0278 # 02 Y:2003 02 2003 REPAIR AND ELIMINATE STEAM LEAKS $27,508 $204 Implemented
WV0278 # 03 Y:2003 03 2003 REPAIR OR REPLACE STEAM TRAPS $23,200 $1,000 Implemented
WV0278 # 04 Y:2003 04 2003 MINIMIZE WATER USAGE $21,233 $3,420 Not Implemented
WV0278 # 05 Y:2003 05 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $18,480 $504 Implemented
WV0278 # 06 Y:2003 06 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,072 $1,915 Not Implemented
WV0278 # 07 Y:2003 07 2003 REDUCE EXCESS STEAM BLEEDING $9,439 $37,100 Not Implemented
WV0278 # 08 Y:2003 08 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,418 $42 Implemented
WV0278 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,387 $7,590 Implemented
WV0278 # 10 Y:2003 10 2003 INSULATE BARE EQUIPMENT $3,709 $258 Implemented
WV0278 # 11 Y:2003 11 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,990 $0 Implemented
WV0278 # 12 Y:2003 12 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $674 $242 Not Implemented
WV0278 # 13 Y:2003 13 2003 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $335 $1,960 Not Implemented
LE0135 # 01 Y:2002 01 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,955 $2,500 Not Implemented
LE0135 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,721 $2,500 Not Implemented
LE0135 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,451 $0 Implemented
LE0135 # 04 Y:2002 04 2002 COVER OPEN TANKS $4,639 $12,000 Not Implemented
LE0135 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,792 $0 Implemented
LE0135 # 06 Y:2002 06 2002 IMPROVE LUBRICATION PRACTICES $1,066 $200 Implemented
LE0135 # 07 Y:2002 07 2002 OPTIMIZE PLANT POWER FACTOR $62,395 $12,000 Implemented
LE0135 # 08 Y:2002 08 2002 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,654 $630 Implemented