Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,871
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1604 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,425 | $67,500 | Not Implemented |
UK1604 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $166 | $196 | Not Implemented |
UK1604 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $153 | $280 | Implemented |
UK1604 # 05 Y:2016 | 05 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,018 | $3,500 | Implemented |
UK1604 # 06 Y:2016 | 06 | 2016 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $2,304 | $3,620 | Implemented |
UK1604 # 07 Y:2016 | 07 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,094 | $5,000 | Implemented |
UK1604 # 08 Y:2016 | 08 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $56 | $61 | Implemented |
UK1604 # 09 Y:2016 | 09 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,645 | $1,200 | Not Implemented |
UK1604 # 10 Y:2016 | 10 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,729 | $6,000 | Not Implemented |
UK1603 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $89,730 | $85,358 | Implemented |
UK1603 # 02 Y:2016 | 02 | 2016 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,306 | $1,445 | Not Implemented |
UK1603 # 03 Y:2016 | 03 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $18,272 | $35,000 | Implemented |
UK1603 # 04 Y:2016 | 04 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,160 | $14,700 | Implemented |
UK1603 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,058 | $0 | Not Implemented |
UK1603 # 06 Y:2016 | 06 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,304 | $1,600 | Implemented |
UK1603 # 07 Y:2016 | 07 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $16,948 | $0 | Implemented |
UK1603 # 08 Y:2016 | 08 | 2016 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $33,264 | $30,000 | Not Implemented |
UK1603 # 09 Y:2016 | 09 | 2016 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $33,165 | $58,682 | Implemented |
UK1603 # 10 Y:2016 | 10 | 2016 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,457 | $0 | Implemented |
UK1602 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,037 | $1,750 | Not Implemented |
UK1602 # 02 Y:2016 | 02 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $106,116 | $60,000 | Not Implemented |
UK1602 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,180 | $890 | Not Implemented |
UK1602 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,357 | $3,168 | Not Implemented |
UK1602 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $922 | $2,336 | Not Implemented |
UK1602 # 06 Y:2016 | 06 | 2016 | INSULATE BARE EQUIPMENT | $618 | $151 | Not Implemented |