IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0356 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $36,798 $13,000 Not Implemented
UM0356 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,424 $9,135 Not Implemented
UM0356 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $12,510 $3,000 Not Implemented
UM0356 # 05 Y:2009 05 2009 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $8,360 $3,300 Not Implemented
UM0356 # 06 Y:2009 06 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,195 $1,000 Not Implemented
UM0356 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $3,155 $4,232 Not Implemented
DL0040 # 01 Y:2009 01 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,947 $25,000 Not Implemented
DL0040 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $2,331 $2,350 Implemented
DL0040 # 03 Y:2009 03 2009 UPGRADE OBSOLETE EQUIPMENT $3,215 $0 Implemented
DL0040 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,110 $3,000 Implemented
DL0040 # 05 Y:2009 05 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $12,823 $14,899 Not Implemented
DL0040 # 06 Y:2009 06 2009 INSTALL TIMERS AND/OR THERMOSTATS $4,313 $2,804 Not Implemented
DL0040 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,533 $38,218 Implemented
CO0624 # 01 Y:2009 01 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,370 $3,610 Not Implemented
CO0624 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,440 $26,850 Not Implemented
CO0624 # 03 Y:2009 03 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $1,750 $10,500 Not Implemented
CO0624 # 04 Y:2009 04 2009 USE SOLAR HEAT TO HEAT WATER $1,750 $11,200 Not Implemented
CO0624 # 05 Y:2009 05 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $510 $5,340 Not Implemented
SU0286 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,756 $0 Implemented
SU0286 # 02 Y:2009 02 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,876 $0 Not Implemented
SU0286 # 03 Y:2009 03 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,389 $0 Not Implemented
SU0286 # 04 Y:2009 04 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,215 $0 Implemented
SU0286 # 05 Y:2009 05 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,974 $0 Not Implemented
SU0286 # 06 Y:2009 06 2009 DISCONNECT BALLASTS $1,462 $0 Not Implemented
SU0286 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,080 $287 Implemented