IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0599 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,256 $36,992 Implemented
NC0599 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $300 $1,500 Implemented
NC0599 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $1,262 $500 Not Implemented
NC0599 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,240 $200 Implemented
NC0599 # 05 Y:2017 05 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,472 $2,940 Not Implemented
NC0599 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $4,037 $13,627 Implemented
BS0103 # 10 Y:2017 10 2017 RECOVER WASTE HEAT FROM EQUIPMENT $1,420 $4,153 Not Implemented
BS0103 # 01 Y:2017 01 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $181 $74 Not Implemented
BS0103 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $172 $60 Not Implemented
BS0103 # 03 Y:2017 03 2017 UPGRADE CONTROLS ON COMPRESSORS $4,908 $2,820 Not Implemented
BS0103 # 04 Y:2017 04 2017 MINIMIZE WATER USAGE $1,019 $585 Not Implemented
BS0103 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $133 $78 Not Implemented
BS0103 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,369 $1,489 Not Implemented
BS0103 # 07 Y:2017 07 2017 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $29,041 $79,703 Not Implemented
BS0103 # 08 Y:2017 08 2017 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $222,139 $1,220,494 Not Implemented
BS0103 # 09 Y:2017 09 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,633 $246 Not Implemented
UA0184 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,297 $94,071 Not Implemented
UA0184 # 02 Y:2017 02 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $105,154 $36,000 Not Implemented
UA0184 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $4,924 $6,004 Not Implemented
UA0184 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,765 $1,285 Not Implemented
UA0184 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,492 $250 Not Implemented
UA0184 # 06 Y:2017 06 2017 OPTIMIZE PLANT POWER FACTOR $12,098 $21,400 Not Implemented
UA0184 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $1,155 $2,485 Not Implemented
UU0122 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $204,798 $0 Not Implemented
UU0122 # 02 Y:2017 02 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $55,559 $500 Implemented