IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,880

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0563 # 02 Y:2023 02 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $20,707 $53,376 Not Implemented
AS0563 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,261 $14,447 Implemented
AS0563 # 04 Y:2023 04 2023 ADJUST BURNERS FOR EFFICIENT OPERATION $4,800 $481 Implemented
AS0563 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $3,177 $4,584 Not Implemented
AS0563 # 06 Y:2023 06 2023 INSTALL SPECTRAL REFLECTORS / DELAMP $651 $106 Not Implemented
DL0229 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $61,397 $0 Not Implemented
DL0229 # 02 Y:2023 02 2023 REDUCE VENTILATION AIR $32,353 $0 Implemented
DL0229 # 03 Y:2023 03 2023 USE OPTIMUM TEMPERATURE $8,303 $0 Not Implemented
DL0229 # 04 Y:2023 04 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $44,923 $1,275 Not Implemented
DL0229 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $2,948 $14,000 Not Implemented
DL0229 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $104,868 $500,000 Not Implemented
DL0228 # 01 Y:2023 01 2023 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT $4,024 $700 Implemented
DL0228 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,279 $0 Implemented
DL0228 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,322 $37,499 Not Implemented
DL0228 # 04 Y:2023 04 2023 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,115 $4,102 Not Implemented
DL0228 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $22,512 $73,200 Not Implemented
DL0228 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,227 $350 Not Implemented
UD1066 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $5,952 $600 Implemented
UD1066 # 02 Y:2023 02 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,630 $1,415 Implemented
UD1066 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,718 $952 Not Implemented
UD1066 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $671 $1,639 Implemented
UD1066 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $1,566 $1,770 Not Implemented
UD1066 # 06 Y:2023 06 2023 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $21,383 $42,766 Not Implemented
UD1066 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,743 $18,195 Not Implemented
UD1066 # 08 Y:2023 08 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5 $0 Not Implemented