IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0102 # 04 Y:2017 04 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $194 $682 Not Implemented
BS0102 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,365 $734 Implemented
BS0102 # 06 Y:2017 06 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $436 $672 Implemented
BS0102 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $91 $85 Not Implemented
BS0102 # 08 Y:2017 08 2017 PAY UTILITY BILLS ON TIME $874 $144 Implemented
DL0177 # 01 Y:2017 01 2017 OPERATE BOILERS ON HIGH FIRE SETTING $16,174 $28,750 Not Implemented
DL0177 # 02 Y:2017 02 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $10,881 $2,032 Not Implemented
DL0177 # 03 Y:2017 03 2017 REPAIR AND ELIMINATE STEAM LEAKS $12,079 $3,000 Not Implemented
DL0177 # 04 Y:2017 04 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $39,860 $40,000 Not Implemented
TR0004 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $666 $1,325 Implemented
TR0004 # 02 Y:2017 02 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,912 $0 Implemented
TR0004 # 03 Y:2017 03 2017 INSTALL REPLACEMENT DOORS $2,305 $10,000 Implemented
TR0004 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $273 $0 Implemented
TR0004 # 05 Y:2017 05 2017 OPTIMIZE PLANT POWER FACTOR $12,722 $56,000 Implemented
TR0004 # 06 Y:2017 06 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,148 $29,271 Not Implemented
TR0004 # 07 Y:2017 07 2017 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $27,235 $100,864 Not Implemented
TR0004 # 08 Y:2017 08 2017 USE OTHER METHODS FOR NEUTRALIZATION $258,000 $292,000 Not Implemented
UD0973 # 01 Y:2017 01 2017 METER WASTE WATER $6,762 $1,000 Not Implemented
UD0973 # 02 Y:2017 02 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $73,029 $100,000 Not Implemented
UD0973 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,320 $1,000 Not Implemented
UD0973 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $23,858 $8,000 Not Implemented
UD0973 # 05 Y:2017 05 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $18,317 $40 Not Implemented
UD0973 # 06 Y:2017 06 2017 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,445 $0 Not Implemented
UD0973 # 07 Y:2017 07 2017 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $58,900 $97,666 Not Implemented
UD0973 # 08 Y:2017 08 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,858 $0 Not Implemented