Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,314
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0421 # 03 Y:2006 | 03 | 2006 | INSTALL EFFICIENT RECTIFIERS | $576 | $15,000 | n/a |
AS0417 # 01 Y:2006 | 01 | 2006 | OPTIMIZE PLANT POWER FACTOR | $20,720 | $27,407 | Not Implemented |
AS0417 # 02 Y:2006 | 02 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $12,507 | $12,000 | Not Implemented |
AS0417 # 03 Y:2006 | 03 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $9,586 | $200 | Not Implemented |
AS0417 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,690 | $1,000 | Not Implemented |
AS0417 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,247 | $10,000 | Not Implemented |
AS0417 # 06 Y:2006 | 06 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $4,692 | $10,000 | Not Implemented |
AS0417 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $404 | $7,797 | Not Implemented |
AS0417 # 08 Y:2006 | 08 | 2006 | INSTALL OCCUPANCY SENSORS | $452 | $300 | Not Implemented |
AS0417 # 09 Y:2006 | 09 | 2006 | USE SOLAR HEAT TO HEAT WATER | $346 | $2,800 | Not Implemented |
AS0416 # 01 Y:2006 | 01 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $31,751 | $36,000 | Not Implemented |
AS0416 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,872 | $34,827 | Implemented |
AS0416 # 03 Y:2006 | 03 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,096 | $0 | Implemented |
AS0416 # 04 Y:2006 | 04 | 2006 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $1,237 | $0 | Not Implemented |
AS0416 # 05 Y:2006 | 05 | 2006 | USE SOLAR HEAT TO HEAT WATER | $345 | $2,050 | Not Implemented |
AS0415 # 01 Y:2006 | 01 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $19,739 | $5,500 | Implemented |
AS0415 # 02 Y:2006 | 02 | 2006 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,463 | $24,000 | Not Implemented |
AS0415 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,372 | $1,000 | Implemented |
AS0415 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $928 | $3,000 | Not Implemented |
AS0415 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $810 | $12,174 | Not Implemented |
AS0415 # 06 Y:2006 | 06 | 2006 | USE SOLAR HEAT TO HEAT WATER | $132 | $2,800 | Not Implemented |
AS0414 # 01 Y:2006 | 01 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $813,934 | $3,030,000 | Not Implemented |
AS0414 # 02 Y:2006 | 02 | 2006 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $28,518 | $20,000 | Implemented |
AS0414 # 03 Y:2006 | 03 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $17,731 | $200 | Implemented |
AS0413 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $21,882 | $1,000 | Implemented |