IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,063

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0031 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $38,274 $45,837 Not Implemented
OD0031 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,159 $2,803 Not Implemented
OD0031 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,349 $66,206 Not Implemented
OD0031 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,336 $48,924 Not Implemented
OD0031 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $5,440 $1,793 Not Implemented
OD0031 # 06 Y:1995 06 1995 RECOVER WASTE HEAT FROM EQUIPMENT $12,618 $26,618 Not Implemented
OD0031 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,309 $1,000 Not Implemented
OD0031 # 08 Y:1995 08 1995 AVOID FROST FORMATION ON EVAPORATORS $29,378 $33,000 Not Implemented
RU0129 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,904 $4,864 Not Implemented
RU0129 # 02 Y:1991 02 1991 INSTALL SET-BACK TIMERS $2,919 $0 Not Implemented
RU0129 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $2,919 $800 Not Implemented
RU0129 # 04 Y:1991 04 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,874 $0 Not Implemented
RU0129 # 05 Y:1991 05 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $807 $0 Not Implemented
RU0061 # 01 Y:1989 01 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,588 $2,880 Implemented
RU0061 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $785 $203 Not Implemented
RU0061 # 03 Y:1989 03 1989 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,320 $0 Not Implemented
RU0052 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,516 $2,000 Implemented
RU0052 # 02 Y:1989 02 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,753 $0 Not Implemented
RU0052 # 04 Y:1989 04 1989 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $3,292 $6,000 Implemented
RU0052 # 05 Y:1989 05 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,251 $4,500 Not Implemented
RU0052 # 06 Y:1989 06 1989 REDUCE VENTILATION AIR $2,959 $2,200 Not Implemented
RU0052 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,620 $0 Implemented
RU0052 # 08 Y:1989 08 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $562 $479 Not Implemented
RU0053 # 01 Y:1989 01 1989 UPGRADE CONVEYORS $25,065 $45,500 Not Implemented
RU0053 # 02 Y:1989 02 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,434 $4,320 Not Implemented