Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,063
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OD0031 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $38,274 | $45,837 | Not Implemented |
OD0031 # 02 Y:1995 | 02 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,159 | $2,803 | Not Implemented |
OD0031 # 03 Y:1995 | 03 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,349 | $66,206 | Not Implemented |
OD0031 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,336 | $48,924 | Not Implemented |
OD0031 # 05 Y:1995 | 05 | 1995 | INSTALL OCCUPANCY SENSORS | $5,440 | $1,793 | Not Implemented |
OD0031 # 06 Y:1995 | 06 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,618 | $26,618 | Not Implemented |
OD0031 # 07 Y:1995 | 07 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,309 | $1,000 | Not Implemented |
OD0031 # 08 Y:1995 | 08 | 1995 | AVOID FROST FORMATION ON EVAPORATORS | $29,378 | $33,000 | Not Implemented |
RU0129 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,904 | $4,864 | Not Implemented |
RU0129 # 02 Y:1991 | 02 | 1991 | INSTALL SET-BACK TIMERS | $2,919 | $0 | Not Implemented |
RU0129 # 03 Y:1991 | 03 | 1991 | IMPROVE LUBRICATION PRACTICES | $2,919 | $800 | Not Implemented |
RU0129 # 04 Y:1991 | 04 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,874 | $0 | Not Implemented |
RU0129 # 05 Y:1991 | 05 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $807 | $0 | Not Implemented |
RU0061 # 01 Y:1989 | 01 | 1989 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,588 | $2,880 | Implemented |
RU0061 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $785 | $203 | Not Implemented |
RU0061 # 03 Y:1989 | 03 | 1989 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,320 | $0 | Not Implemented |
RU0052 # 01 Y:1989 | 01 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $19,516 | $2,000 | Implemented |
RU0052 # 02 Y:1989 | 02 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,753 | $0 | Not Implemented |
RU0052 # 04 Y:1989 | 04 | 1989 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $3,292 | $6,000 | Implemented |
RU0052 # 05 Y:1989 | 05 | 1989 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,251 | $4,500 | Not Implemented |
RU0052 # 06 Y:1989 | 06 | 1989 | REDUCE VENTILATION AIR | $2,959 | $2,200 | Not Implemented |
RU0052 # 07 Y:1989 | 07 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,620 | $0 | Implemented |
RU0052 # 08 Y:1989 | 08 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $562 | $479 | Not Implemented |
RU0053 # 01 Y:1989 | 01 | 1989 | UPGRADE CONVEYORS | $25,065 | $45,500 | Not Implemented |
RU0053 # 02 Y:1989 | 02 | 1989 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,434 | $4,320 | Not Implemented |