Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,500
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0318 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $244 | $100 | Implemented |
NC0318 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $108 | $250 | Implemented |
NC0317 # 01 Y:2005 | 01 | 2005 | ADJUST BURNERS FOR EFFICIENT OPERATION | $10,821 | $1,000 | Implemented |
NC0317 # 02 Y:2005 | 02 | 2005 | INSULATE FEEDWATER TANK | $2,381 | $1,000 | Implemented |
NC0317 # 03 Y:2005 | 03 | 2005 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $116,959 | $53,625 | Implemented |
NC0317 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $913 | $100 | Implemented |
NC0317 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $748 | $924 | Implemented |
NC0317 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,676 | $1,847 | Implemented |
NC0317 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $954 | $358 | Not Implemented |
NC0316 # 01 Y:2005 | 01 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $18,271 | $87,125 | Not Implemented |
NC0316 # 02 Y:2005 | 02 | 2005 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $10,570 | $26,949 | Not Implemented |
NC0316 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $491 | $321 | Not Implemented |
NC0316 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $327 | $100 | Implemented |
LE0213 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $24,825 | $1,344 | Implemented |
LE0213 # 02 Y:2005 | 02 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,533 | $6,000 | Implemented |
LE0213 # 03 Y:2005 | 03 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,703 | $25,000 | Not Implemented |
LE0213 # 04 Y:2005 | 04 | 2005 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $5,279 | $368 | Not Implemented |
LE0213 # 05 Y:2005 | 05 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,792 | $1,000 | Implemented |
LE0213 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,694 | $2,000 | Implemented |
LE0213 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,384 | $200 | Implemented |
LE0213 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,210 | $53,880 | Implemented |
WV0313 # 01 Y:2005 | 01 | 2005 | REPAIR OR REPLACE STEAM TRAPS | $94,235 | $1,000 | Implemented |
WV0313 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $28,522 | $10,250 | Not Implemented |
WV0313 # 03 Y:2005 | 03 | 2005 | OPERATE BOILERS ON HIGH FIRE SETTING | $27,626 | $5,110 | Not Implemented |
WV0313 # 04 Y:2005 | 04 | 2005 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $21,789 | $110 | Not Implemented |