IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0223 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $133 $290 Implemented
CO0223 # 07 Y:1991 07 1991 RECOVER WASTE HEAT FROM EQUIPMENT $225 $610 Implemented
CO0224 # 01 Y:1991 01 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $10,425 $6,735 Not Implemented
CO0224 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $10,680 $15,400 Not Implemented
CO0224 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,250 $29,660 Not Implemented
CO0224 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,971 $38,109 Not Implemented
CO0224 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,580 $480 Not Implemented
CO0225 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $211 $314 Not Implemented
AS0032 # 01 Y:1991 01 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,399 $8,199 Not Implemented
AS0032 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,218 $0 Not Implemented
AS0032 # 03 Y:1991 03 1991 INSULATE BARE EQUIPMENT $8,948 $708 Not Implemented
AS0032 # 04 Y:1991 04 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,528 $4,148 Not Implemented
AS0032 # 05 Y:1991 05 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,425 $100 Not Implemented
AS0032 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $160 $53 Not Implemented
AS0032 # 08 Y:1991 08 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63 $360 Not Implemented
AS0033 # 01 Y:1991 01 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,774 $4,910 Not Implemented
AS0033 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,078 $0 Not Implemented
AS0033 # 03 Y:1991 03 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,442 $40 Not Implemented
AS0033 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,845 $100 Not Implemented
AS0033 # 05 Y:1991 05 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,450 $2,862 Not Implemented
AS0034 # 01 Y:1991 01 1991 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $175,405 $0 Not Implemented
AS0034 # 02 Y:1991 02 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,714 $1,000 Not Implemented
AS0034 # 03 Y:1991 03 1991 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,459 $100,000 Not Implemented
AS0034 # 04 Y:1991 04 1991 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $648 $796 Not Implemented
AS0034 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $9,504 $1,290 Not Implemented