Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0324 # 01 Y:2005 | 01 | 2005 | OPTIMIZE PLANT POWER FACTOR | $11,798 | $10,700 | Not Implemented |
WV0324 # 02 Y:2005 | 02 | 2005 | INSULATE BARE EQUIPMENT | $7,542 | $6,594 | Implemented |
WV0324 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,407 | $900 | Implemented |
WV0324 # 04 Y:2005 | 04 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $2,674 | $135 | Implemented |
WV0324 # 05 Y:2005 | 05 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,788 | $0 | Not Implemented |
WV0324 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,567 | $0 | Implemented |
WV0324 # 07 Y:2005 | 07 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,475 | $1,005 | Not Implemented |
WV0324 # 08 Y:2005 | 08 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,399 | $60 | Not Implemented |
WV0324 # 09 Y:2005 | 09 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,312 | $165 | Implemented |
WV0324 # 10 Y:2005 | 10 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $831 | $70 | Implemented |
WV0324 # 11 Y:2005 | 11 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $748 | $2,542 | Implemented |
WV0324 # 12 Y:2005 | 12 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $396 | $140 | Not Implemented |
NC0322 # 01 Y:2005 | 01 | 2005 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $139,400 | $9,500 | Implemented |
NC0322 # 02 Y:2005 | 02 | 2005 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $8,353 | $2,650 | Implemented |
NC0322 # 03 Y:2005 | 03 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $74,009 | $100,000 | Not Implemented |
NC0322 # 04 Y:2005 | 04 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $573 | $0 | Implemented |
NC0322 # 05 Y:2005 | 05 | 2005 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $2,592 | $821 | Implemented |
NC0322 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $462 | $100 | Implemented |
NC0322 # 07 Y:2005 | 07 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $723 | $298 | Implemented |
NC0322 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $217 | $2,000 | Implemented |
OR0486 # 01 Y:2005 | 01 | 2005 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $536,590 | $3,000 | Not Implemented |
OR0486 # 02 Y:2005 | 02 | 2005 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $75,000 | $50,000 | Implemented |
OR0486 # 03 Y:2005 | 03 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $24,600 | $800 | Not Implemented |
OR0486 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $13,000 | $0 | Not Implemented |
OR0486 # 05 Y:2005 | 05 | 2005 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $0 | $6,900 | Implemented |