IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0262 # 11 Y:2007 11 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,066 $4,000 Not Implemented
LE0262 # 12 Y:2007 12 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,980 $1,400 Not Implemented
LE0262 # 13 Y:2007 13 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,168 $1,000 Not Implemented
LE0262 # 14 Y:2007 14 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $1,804 $535 Not Implemented
LE0262 # 15 Y:2007 15 2007 INSTALL OCCUPANCY SENSORS $25,575 $11,250 Not Implemented
GT0839 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,317 $5,346 Implemented
GT0839 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,858 $49,525 Implemented
GT0839 # 03 Y:2007 03 2007 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $4,603 $5,050 Not Implemented
GT0839 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,992 $1,000 Implemented
GT0839 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,582 $0 Implemented
UM0324 # 01 Y:2007 01 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,396 $2,140 Not Implemented
UM0324 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $5,954 $543 Not Implemented
UM0324 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,631 $4,000 Not Implemented
UM0324 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,978 $0 Implemented
UM0324 # 05 Y:2007 05 2007 OPTIMIZE PLANT POWER FACTOR $7,222 $6,917 Implemented
UW0005 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,804 $7,172 Implemented
UW0005 # 02 Y:2007 02 2007 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $15,876 $4,452 Implemented
UW0005 # 03 Y:2007 03 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,246 $1,162 Implemented
UW0005 # 04 Y:2007 04 2007 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $8,530 $1,852 Not Implemented
UW0005 # 05 Y:2007 05 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,388 $2,619 Implemented
UW0005 # 06 Y:2007 06 2007 OPTIMIZE PLANT POWER FACTOR $6,971 $17,098 Not Implemented
UW0005 # 07 Y:2007 07 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,766 $432 Implemented
UW0005 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,795 $398 Implemented
UW0005 # 09 Y:2007 09 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $354 $650 Not Implemented
IC0131 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,220 $65,800 Implemented