IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0436 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,983 $8,375 Not Implemented
WV0436 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,039 $1,920 Not Implemented
WV0436 # 07 Y:2011 07 2011 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $7,082 $25,000 Not Implemented
WV0436 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,227 $12,576 Implemented
WV0436 # 09 Y:2011 09 2011 INSTALL TIMERS AND/OR THERMOSTATS $4,976 $5,400 Not Implemented
WV0436 # 10 Y:2011 10 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,400 $1,000 Implemented
WV0436 # 11 Y:2011 11 2011 INSULATE BARE EQUIPMENT $335 $154 Implemented
UA0065 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,459 $24,444 Not Implemented
UA0065 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $668 $1,241 Implemented
UA0065 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,025 $800 Not Implemented
UA0065 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $702 $1,100 Implemented
UA0065 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $832 $1,935 Not Implemented
UA0065 # 06 Y:2011 06 2011 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $510 $1,533 Not Implemented
WV0435 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,580 $26,175 Not Implemented
WV0435 # 02 Y:2011 02 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,088 $2,144 Implemented
WV0435 # 03 Y:2011 03 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,062 $10,480 Not Implemented
WV0435 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,758 $272 Implemented
WV0435 # 05 Y:2011 05 2011 OPTIMIZE PLANT POWER FACTOR $2,651 $5,480 Not Implemented
WV0435 # 06 Y:2011 06 2011 DEVELOP A REPAIR/REPLACE POLICY $1,546 $668 Implemented
WV0435 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,437 $4,415 Implemented
WV0435 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,264 $3,284 Not Implemented
WV0435 # 09 Y:2011 09 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,230 $1,000 Implemented
WV0435 # 10 Y:2011 10 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $737 $878 Not Implemented
WV0435 # 11 Y:2011 11 2011 USE SYNTHETIC LUBRICANT $608 $516 Implemented
WV0435 # 12 Y:2011 12 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $330 $66 Implemented