IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0411 # 04 Y:2012 04 2012 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $56,000 $225,000 Not Implemented
UM0411 # 05 Y:2012 05 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $15,341 $5,000 Not Implemented
AM0620 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,900 $2,000 Implemented
AM0620 # 02 Y:2012 02 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,800 $0 Implemented
AM0620 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,660 $120 Implemented
AM0620 # 04 Y:2012 04 2012 REPLACE BOILER $5,730 $30,000 Implemented
AM0620 # 05 Y:2012 05 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,245 $54 Not Implemented
AM0620 # 06 Y:2012 06 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,965 $240 Implemented
AM0620 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,505 $750 Not Implemented
AM0620 # 08 Y:2012 08 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,390 $0 Implemented
AM0620 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,270 $3,290 Implemented
AM0620 # 10 Y:2012 10 2012 INSULATE BARE EQUIPMENT $1,030 $1,650 Implemented
AM0620 # 11 Y:2012 11 2012 USE SYNTHETIC LUBRICANT $515 $0 Not Implemented
WM0014 # 01 Y:2012 01 2012 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $15,433 $47,000 Implemented
WM0014 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $233 $630 Implemented
WM0014 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $1,639 $513 Not Implemented
WM0014 # 04 Y:2012 04 2012 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $1,911 $8,170 Implemented
BS0007 # 01 Y:2012 01 2012 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,790 $4,911 Not Implemented
BS0007 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,760 $649 Implemented
BS0007 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $98 $0 Not Implemented
BS0007 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $186 $300 Not Implemented
BS0007 # 05 Y:2012 05 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,845 $6,260 Not Implemented
BS0007 # 06 Y:2012 06 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,204 $7,725 Not Implemented
UM0410 # 01 Y:2012 01 2012 OPTIMIZE PLANT POWER FACTOR $7,109 $20,000 Not Implemented
UM0410 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,453 $11,580 Not Implemented