IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0122 # 03 Y:2017 03 2017 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $15,162 $26,440 Not Implemented
UU0122 # 04 Y:2017 04 2017 UPGRADE CONTROLS ON COMPRESSORS $7,349 $800 Implemented
UU0122 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $6,799 $4,244 Implemented
UU0122 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $5,324 $11,240 Not Implemented
UU0122 # 07 Y:2017 07 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,745 $0 Not Implemented
UF0511 # 01 Y:2017 01 2017 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $5,783,172 $13,354,800 Not Implemented
UF0511 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $200,909 $20,000 Not Implemented
UF0511 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,022 $14,000 Not Implemented
UF0511 # 04 Y:2017 04 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,447 $20,214 Implemented
UF0511 # 05 Y:2017 05 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,152 $2,800 Not Implemented
UF0511 # 06 Y:2017 06 2017 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $495,807 $1,875,550 Implemented
BS0102 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $7,306 $495 Implemented
BS0102 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,159 $10,362 Implemented
BS0102 # 03 Y:2017 03 2017 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,991 $1,301 Not Implemented
BS0102 # 04 Y:2017 04 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $194 $682 Not Implemented
BS0102 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,365 $734 Implemented
BS0102 # 06 Y:2017 06 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $436 $672 Implemented
BS0102 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $91 $85 Not Implemented
BS0102 # 08 Y:2017 08 2017 PAY UTILITY BILLS ON TIME $874 $144 Implemented
MZ0239 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,680 $0 Implemented
MZ0239 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $605 $0 Implemented
MZ0239 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $70 $0 Implemented
MZ0239 # 04 Y:2017 04 2017 RECOVER WASTE HEAT FROM EQUIPMENT $3,933 $1,539 Implemented
MZ0239 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,398 $22,603 Implemented
MZ0239 # 06 Y:2017 06 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $403 $100 Implemented