Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0997 # 08 Y:2019 | 08 | 2019 | INSTALL AUTOMATIC STACK DAMPER | $19,943 | $1,000 | Not Implemented |
UD0997 # 09 Y:2019 | 09 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $26,037 | $50,514 | Not Implemented |
UD0997 # 10 Y:2019 | 10 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $66,439 | $164,220 | Implemented |
UD0996 # 01 Y:2019 | 01 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,447 | $0 | Implemented |
UD0996 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,125 | $0 | Not Implemented |
UD0996 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,446 | $0 | Not Implemented |
UD0996 # 04 Y:2019 | 04 | 2019 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $618 | $0 | Not Implemented |
UD0996 # 05 Y:2019 | 05 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $618 | $0 | Implemented |
UD0996 # 06 Y:2019 | 06 | 2019 | COVER OPEN TANKS | $8,047 | $1,400 | Not Implemented |
UD0996 # 07 Y:2019 | 07 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $18,128 | $3,500 | Not Implemented |
UD0996 # 08 Y:2019 | 08 | 2019 | OPTIMIZE PLANT POWER FACTOR | $127,402 | $60,000 | Implemented |
UD0996 # 09 Y:2019 | 09 | 2019 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $48,531 | $11,000 | Implemented |
UD0996 # 10 Y:2019 | 10 | 2019 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $37,159 | $98,800 | Not Implemented |
UD0996 # 11 Y:2019 | 11 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $28,290 | $5,250 | Not Implemented |
UD0996 # 12 Y:2019 | 12 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,848 | $80,000 | Implemented |
WV0575 # 01 Y:2019 | 01 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,365 | $5,150 | Not Implemented |
WV0575 # 02 Y:2019 | 02 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $2,374 | $8,525 | Not Implemented |
WV0575 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,872 | $896 | Implemented |
WV0575 # 04 Y:2019 | 04 | 2019 | INSTALL SET-BACK TIMERS | $1,692 | $105 | Implemented |
WV0575 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $940 | $70 | Implemented |
WV0575 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $715 | $1,275 | Not Implemented |
WV0575 # 07 Y:2019 | 07 | 2019 | RECYCLE WHITE WATER | $674 | $2,000 | Not Implemented |
WV0575 # 08 Y:2019 | 08 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $576 | $558 | Implemented |
WV0575 # 09 Y:2019 | 09 | 2019 | MINIMIZE WATER USAGE | $510 | $1,400 | Not Implemented |
WV0574 # 01 Y:2019 | 01 | 2019 | REVISE RAW MATERIAL SPECS | $26,910 | $52,500 | Not Implemented |