Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,746
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0149 # 08 Y:1984 | 08 | 1984 | INSULATE BARE EQUIPMENT | $155 | $235 | Implemented |
OK0149 # 09 Y:1984 | 09 | 1984 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $826 | $0 | Implemented |
OK0149 # 10 Y:1984 | 10 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,537 | $480 | Implemented |
OK0150 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $320 | $450 | Not Implemented |
OK0150 # 02 Y:1984 | 02 | 1984 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $140 | $0 | Implemented |
OK0150 # 03 Y:1984 | 03 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $45 | $60 | Implemented |
OK0150 # 04 Y:1984 | 04 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $1,250 | $180 | Implemented |
OK0150 # 05 Y:1984 | 05 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $745 | $122 | Not Implemented |
OK0150 # 06 Y:1984 | 06 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,460 | $1,350 | Not Implemented |
OK0150 # 07 Y:1984 | 07 | 1984 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $60 | $50 | Implemented |
OK0150 # 08 Y:1984 | 08 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $355 | $80 | Implemented |
OK0150 # 09 Y:1984 | 09 | 1984 | INSULATE BARE EQUIPMENT | $103 | $84 | Implemented |
OK0150 # 10 Y:1984 | 10 | 1984 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $563 | $116 | Not Implemented |
OK0150 # 11 Y:1984 | 11 | 1984 | INSULATE BARE EQUIPMENT | $113 | $310 | Implemented |
OK0150 # 12 Y:1984 | 12 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $105 | $0 | Not Implemented |
OK0150 # 13 Y:1984 | 13 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $42 | $127 | Implemented |
TN0212 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,487 | $400 | Implemented |
TN0212 # 02 Y:1984 | 02 | 1984 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $6,363 | $10,000 | Not Implemented |
TN0212 # 03 Y:1984 | 03 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $2,822 | $1,240 | Not Implemented |
TN0212 # 04 Y:1984 | 04 | 1984 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $2,727 | $10,200 | Not Implemented |
TN0212 # 05 Y:1984 | 05 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,547 | $500 | Implemented |
TN0212 # 06 Y:1984 | 06 | 1984 | INSULATE BARE EQUIPMENT | $1,503 | $498 | Implemented |
TN0217 # 01 Y:1984 | 01 | 1984 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $51,259 | $42,740 | Not Implemented |
TN0217 # 02 Y:1984 | 02 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $24,926 | $1,300 | Implemented |
TN0217 # 03 Y:1984 | 03 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $22,604 | $1,425 | Implemented |