IAC logo
IAC Assessment: OK0149
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0149
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1984
Principal Product FROZEN WAFFLES
NAICS n/a
SIC 2038 - Frozen Specialties, Nec
Sales $1,000,000-$5,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 18,250,000 Pounds
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $275,447 8,310,082 kWh $0.03
Natural Gas $270,256 54,251 MMBtu $4.98
TOTAL ENERGY COSTS $545,703
RECOMMENDED SAVINGS* $12,120 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,899
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$363
Cost:
$650
- - $483 97 $(-120) - -
-
kWh
$483
97
MMBtu
$(-120)
-
$
02: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$3,221
Cost:
$2,000
$3,221 89,097 - - - - $3,221
89,097
kWh
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$351
Cost:
$220
$351 9,672 - - - - $351
9,672
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$625
Cost:
$1,700
$1,315 29,601 - - $(-690) - $1,315
29,601
kWh
-
-
MMBtu
$(-690)
-
$
05: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$360
Cost:
$104
- - $360 72 - - -
-
kWh
$360
72
MMBtu
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,556
Cost:
$785
- - $3,556 714 - - -
-
kWh
$3,556
714
MMBtu
-
-
$
07: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$126
Cost:
$235
- - $126 25 - - -
-
kWh
$126
25
MMBtu
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$155
Cost:
$235
- - $155 31 - - -
-
kWh
$155
31
MMBtu
-
-
$
09: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$826
Cost:
-
$826 - - - - - $826
-
kWh
-
-
MMBtu
-
-
$
10: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,537
Cost:
$480
$2,537 - - - - - $2,537
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$12,120
Cost:
$6,409
$8,250 128,370 $4,680 939 $(-810) - $8,250
128,370
kWh
$4,680
939
MMBtu
$(-810)
-
$
TOTAL IMPLEMENTED Savings:
$8,899
Cost:
$4,409
$5,029 39,273 $4,680 939 $(-810) - $5,029
39,273
kWh
$4,680
939
MMBtu
$(-810)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes