IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,175

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT0092 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $331 $128 Not Implemented
LT0092 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,320 $9,600 Not Implemented
LT0092 # 03 Y:1987 03 1987 INSTALL TIMERS AND/OR THERMOSTATS $800 $350 Implemented
LT0093 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,500 $2,500 Implemented
LT0093 # 02 Y:1987 02 1987 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $609,085 $0 Not Implemented
LT0093 # 03 Y:1987 03 1987 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $408 $25,000 Implemented
LT0093 # 04 Y:1987 04 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $1,610 $5,000 Implemented
LT0093 # 05 Y:1987 05 1987 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $5,720 $3,458 Implemented
LT0093 # 06 Y:1987 06 1987 REPAIR AND ELIMINATE STEAM LEAKS $3,200 $420 Implemented
LT0093 # 07 Y:1987 07 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,820 $6,471 Implemented
LT0094 # 01 Y:1987 01 1987 INSULATE BARE EQUIPMENT $2,880 $3,000 Not Implemented
LT0094 # 02 Y:1987 02 1987 OPTIMIZE PLANT POWER FACTOR $6,830 $10,000 Implemented
LT0094 # 03 Y:1987 03 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $950 $755 Implemented
LT0094 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $684 $97 Implemented
MA0096 # 01 Y:1987 01 1987 INSULATE BARE EQUIPMENT $1,581 $551 Implemented
MA0096 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $402 $78 Implemented
MA0096 # 03 Y:1987 03 1987 RECOVER WASTE HEAT FROM EQUIPMENT $1,922 $746 Implemented
MA0096 # 04 Y:1987 04 1987 INSTALL TIMERS AND/OR THERMOSTATS $715 $450 Not Implemented
MA0096 # 05 Y:1987 05 1987 INSULATE BARE EQUIPMENT $1,966 $1,014 Not Implemented
MA0096 # 06 Y:1987 06 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,391 $893 Not Implemented
MA0096 # 07 Y:1987 07 1987 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $22,563 $4,750 Implemented
MA0096 # 08 Y:1987 08 1987 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,030 $3,900 Not Implemented
LT0085 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,100 $2,000 Not Implemented
LT0085 # 02 Y:1987 02 1987 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $290 $333 Implemented
LT0085 # 03 Y:1987 03 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $103 $202 Implemented