IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0260 # 11 Y:1996 11 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,223 $200 n/a
OR0281 # 01 Y:1996 01 1996 KEEP BOILER TUBES CLEAN $10,640 $800 Implemented
OR0281 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,000 $128,480 Implemented
OR0281 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,450 $34,810 Implemented
OR0281 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,510 $11,180 Implemented
OR0281 # 05 Y:1996 05 1996 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $7,790 $2,000 Not Implemented
OR0281 # 06 Y:1996 06 1996 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,770 $5,000 Not Implemented
OR0281 # 07 Y:1996 07 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $10,430 $50,000 Implemented
OR0281 # 08 Y:1996 08 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $120 $0 Implemented
UM0066 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $9,433 $6,541 Not Implemented
UM0066 # 02 Y:1996 02 1996 INSULATE BARE EQUIPMENT $256 $990 Not Implemented
UM0066 # 03 Y:1996 03 1996 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,215 $39,138 Not Implemented
UM0066 # 04 Y:1996 04 1996 USE "WASH-LESS" PROCESSING EQUIPMENT $14,491 $11,000 Not Implemented
UM0065 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $293 $300 Not Implemented
UM0065 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,223 $5,402 Not Implemented
UM0065 # 03 Y:1996 03 1996 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $464 $990 Not Implemented
UM0065 # 04 Y:1996 04 1996 RECOVER AND REUSE WASTE MATERIAL $42,447 $990 Not Implemented
WI0282 # 01 Y:1996 01 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,267 $0 Not Implemented
WI0282 # 02 Y:1996 02 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $619 $0 Not Implemented
WI0282 # 03 Y:1996 03 1996 INSTALL SET-BACK TIMERS $2,726 $800 Implemented
WI0282 # 04 Y:1996 04 1996 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,019 $0 Implemented
WI0282 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $557 $283 Implemented
WI0282 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $375 $375 Implemented
WI0282 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $358 $640 Not Implemented
WI0282 # 08 Y:1996 08 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $212 $0 Implemented