Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,403
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ND0260 # 11 Y:1996 | 11 | 1996 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $3,223 | $200 | n/a |
OR0281 # 01 Y:1996 | 01 | 1996 | KEEP BOILER TUBES CLEAN | $10,640 | $800 | Implemented |
OR0281 # 02 Y:1996 | 02 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,000 | $128,480 | Implemented |
OR0281 # 03 Y:1996 | 03 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,450 | $34,810 | Implemented |
OR0281 # 04 Y:1996 | 04 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,510 | $11,180 | Implemented |
OR0281 # 05 Y:1996 | 05 | 1996 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $7,790 | $2,000 | Not Implemented |
OR0281 # 06 Y:1996 | 06 | 1996 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $2,770 | $5,000 | Not Implemented |
OR0281 # 07 Y:1996 | 07 | 1996 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $10,430 | $50,000 | Implemented |
OR0281 # 08 Y:1996 | 08 | 1996 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $120 | $0 | Implemented |
UM0066 # 01 Y:1996 | 01 | 1996 | OPTIMIZE PLANT POWER FACTOR | $9,433 | $6,541 | Not Implemented |
UM0066 # 02 Y:1996 | 02 | 1996 | INSULATE BARE EQUIPMENT | $256 | $990 | Not Implemented |
UM0066 # 03 Y:1996 | 03 | 1996 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $8,215 | $39,138 | Not Implemented |
UM0066 # 04 Y:1996 | 04 | 1996 | USE "WASH-LESS" PROCESSING EQUIPMENT | $14,491 | $11,000 | Not Implemented |
UM0065 # 01 Y:1996 | 01 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $293 | $300 | Not Implemented |
UM0065 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,223 | $5,402 | Not Implemented |
UM0065 # 03 Y:1996 | 03 | 1996 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $464 | $990 | Not Implemented |
UM0065 # 04 Y:1996 | 04 | 1996 | RECOVER AND REUSE WASTE MATERIAL | $42,447 | $990 | Not Implemented |
WI0282 # 01 Y:1996 | 01 | 1996 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,267 | $0 | Not Implemented |
WI0282 # 02 Y:1996 | 02 | 1996 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $619 | $0 | Not Implemented |
WI0282 # 03 Y:1996 | 03 | 1996 | INSTALL SET-BACK TIMERS | $2,726 | $800 | Implemented |
WI0282 # 04 Y:1996 | 04 | 1996 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,019 | $0 | Implemented |
WI0282 # 05 Y:1996 | 05 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $557 | $283 | Implemented |
WI0282 # 06 Y:1996 | 06 | 1996 | INSTALL OCCUPANCY SENSORS | $375 | $375 | Implemented |
WI0282 # 07 Y:1996 | 07 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $358 | $640 | Not Implemented |
WI0282 # 08 Y:1996 | 08 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $212 | $0 | Implemented |