IAC logo
IAC Assessment: WI0282
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0282
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1996
Principal Product Aluminum and zinc die casts
NAICS n/a
SIC 3544 - Special Dies, Tools, Jigs & Fixtures
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 65,000
Annual Production 100 Pieces
Production Hrs. Annual 4,625
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,601 2,193,435 kWh $0.05
Electricity Demand $49,250 5,661 kW-months/year $8.70
Electricity Fees $1,564 - $ -
Natural Gas $14,124 3,068 MMBtu $4.60
TOTAL ENERGY COSTS $182,539
RECOMMENDED SAVINGS* $10,240 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,889
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,267
Cost:
-
- - $4,339 475 - - $(-72) - -
-
kWh
$4,339
475
kW-months/year
-
-
MMBtu
$(-72)
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$619
Cost:
-
$551 18,171 $468 51 - - $(-400) - $551
18,171
kWh
$468
51
kW-months/year
-
-
MMBtu
$(-400)
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,726
Cost:
$800
- - - - $2,726 592 - - -
-
kWh
-
-
kW-months/year
$2,726
592
MMBtu
-
-
$
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,019
Cost:
-
$1,019 33,705 - - - - - - $1,019
33,705
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$557
Cost:
$283
$349 11,430 $208 23 - - - - $349
11,430
kWh
$208
23
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$375
Cost:
$375
$375 5,862 - - - - - - $375
5,862
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$358
Cost:
$640
$216 7,034 $142 16 - - - - $216
7,034
kWh
$142
16
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$212
Cost:
-
$212 7,034 - - - - - - $212
7,034
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$107
Cost:
$149
- - - - $107 23 - - -
-
kWh
-
-
kW-months/year
$107
23
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$10,240
Cost:
$2,247
$2,722 83,236 $5,157 565 $2,833 615 $(-472) - $2,722
83,236
kWh
$5,157
565
kW-months/year
$2,833
615
MMBtu
$(-472)
-
$
TOTAL IMPLEMENTED Savings:
$4,889
Cost:
$1,458
$1,955 58,031 $208 23 $2,726 592 - - $1,955
58,031
kWh
$208
23
kW-months/year
$2,726
592
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes