IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0085 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $6,840 $0 Implemented
TA0085 # 05 Y:2004 05 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,110 $0 Implemented
MA0563 # 01 Y:2004 01 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $39,550 $12,000 Implemented
MA0563 # 02 Y:2004 02 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,769 $650 Implemented
MA0563 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $257 $155 Not Implemented
MA0563 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $116 $0 Implemented
OR0470 # 01 Y:2004 01 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $92,000 $1,200 Not Implemented
OR0470 # 02 Y:2004 02 2004 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $11,400 $2,800 Not Implemented
OR0470 # 03 Y:2004 03 2004 ELIMINATE/REDUCE AN OPERATION $9,627 $250 Not Implemented
OR0470 # 04 Y:2004 04 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,990 $300 Not Implemented
OR0470 # 05 Y:2004 05 2004 ELIMINATE/REDUCE AN OPERATION $1,185 $165 Implemented
LE0199 # 01 Y:2004 01 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $37,230 $16,000 n/a
LE0199 # 02 Y:2004 02 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $9,780 $15,000 Not Implemented
LE0199 # 03 Y:2004 03 2004 INSULATE FEEDWATER TANK $8,188 $2,220 Implemented
LE0199 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,404 $300 Implemented
LE0199 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,019 $1,884 Not Implemented
UM0266 # 01 Y:2004 01 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $11,825 $4,500 Implemented
UM0266 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,131 $7,512 Implemented
UM0266 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,042 $900 Implemented
UM0266 # 04 Y:2004 04 2004 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,182 $1,000 Not Implemented
UM0266 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,847 $2,000 Implemented
UM0266 # 06 Y:2004 06 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,400 $700 Not Implemented
UM0266 # 07 Y:2004 07 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,312 $3,500 Not Implemented
UM0266 # 08 Y:2004 08 2004 REVISE SMOKE CLEANUP FROM OPERATIONS $1,614 $500 Implemented
UM0266 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $1,195 $603 Not Implemented