IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0486 # 06 Y:2005 06 2005 RECOVER AND REUSE WASTE MATERIAL $6,360 $0 Not Implemented
OR0486 # 07 Y:2005 07 2005 DEVELOP STANDARD OPERATING PROCEDURES $5,000 $40 Not Implemented
OR0486 # 08 Y:2005 08 2005 REDUCE OR ELIMINATE WASTE $4,680 $65 Not Implemented
OR0486 # 09 Y:2005 09 2005 OPTIMIZE PLANT POWER FACTOR $3,350 $3,050 Implemented
OR0486 # 10 Y:2005 10 2005 INSTALL AUTOMATIC PACKING EQUIPMENT $25,000 $49,000 Implemented
OR0486 # 11 Y:2005 11 2005 USE PHOTOCELL CONTROLS $2,700 $1,300 Implemented
OR0486 # 12 Y:2005 12 2005 INSULATE FEEDWATER TANK $1,800 $1,500 Implemented
MI0117 # 01 Y:2005 01 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $16,898 $1,350 Implemented
MI0117 # 02 Y:2005 02 2005 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,463 $11,400 Implemented
MI0117 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,012 $906 Implemented
MI0117 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,621 $56 Not Implemented
MI0117 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,044 $5,024 Not Implemented
LL0234 # 01 Y:2005 01 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $24,789 $0 Not Implemented
LL0234 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $69,333 $500 Implemented
LL0234 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,415 $1,250 Implemented
LL0234 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $1,630 $0 Not Implemented
LL0234 # 05 Y:2005 05 2005 USE PHOTOCELL CONTROLS $501 $100 Implemented
LL0234 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136 $200 Implemented
LL0234 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $393 $300 Implemented
LL0234 # 08 Y:2005 08 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $24,050 $7,000 Implemented
LL0234 # 09 Y:2005 09 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $6,570 $0 Not Implemented
LL0233 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,386 $73,240 Implemented
LL0233 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $38,693 $0 Not Implemented
LL0233 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,619 $14,000 Implemented
LL0233 # 04 Y:2005 04 2005 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $17,072 $2,900 Implemented