IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0854 # 04 Y:2008 04 2008 REPAIR OR REPLACE STEAM TRAPS $25,424 $5,000 Implemented
GT0854 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,990 $80,000 Not Implemented
GT0854 # 06 Y:2008 06 2008 REDUCE EXCESSIVE BOILER BLOWDOWN $4,690 $0 Not Implemented
GT0854 # 07 Y:2008 07 2008 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,141 $10,000 Not Implemented
GT0854 # 08 Y:2008 08 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,260 $23,000 Implemented
GT0854 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,015 $35,125 Implemented
DL0020 # 01 Y:2008 01 2008 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $55,000 $30,000 Not Implemented
DL0020 # 02 Y:2008 02 2008 REDUCE VENTILATION AIR $29,300 $125,000 Not Implemented
DL0020 # 03 Y:2008 03 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,000 $13,700 Not Implemented
DL0020 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,334 $34,037 Implemented
DL0020 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $740 $350 Implemented
DL0020 # 06 Y:2008 06 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $63 $130 Not Implemented
LL0299 # 01 Y:2008 01 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $209,418 $131,055 Implemented
LL0299 # 02 Y:2008 02 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $35,938 $17,250 Not Implemented
LL0299 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,556 $11,220 Implemented
LL0299 # 04 Y:2008 04 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $2,828 $3,265 Not Implemented
LL0299 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,991 $1,275 Not Implemented
LL0299 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $1,851 $4,687 Not Implemented
LL0299 # 07 Y:2008 07 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,718 $2,520 Implemented
AM0551 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,500 $1,550 Implemented
AM0551 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,950 $32,300 Implemented
AM0551 # 03 Y:2008 03 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,330 $12,480 Implemented
AM0551 # 04 Y:2008 04 2008 CHECK FOR ACCURACY OF UTILITY / POWER METERS $6,600 $5,000 Implemented
AM0551 # 05 Y:2008 05 2008 IMPROVE HANDLING PRACTICES $5,090 $110 Implemented
AM0551 # 06 Y:2008 06 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,800 $1,000 Implemented