IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0532 # 09 Y:2016 09 2016 DEVELOP A REPAIR/REPLACE POLICY $806 $235 Implemented
WV0532 # 10 Y:2016 10 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $811 $0 Implemented
WV0532 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $796 $795 Implemented
WV0532 # 12 Y:2016 12 2016 UPGRADE CONTROLS ON COMPRESSORS $530 $2,500 Not Implemented
WV0532 # 13 Y:2016 13 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $145 $25 Implemented
WV0531 # 01 Y:2016 01 2016 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $19,064 $33,000 Not Implemented
WV0531 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,039 $63,000 Not Implemented
WV0531 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $12,371 $25,305 Implemented
WV0531 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,464 $4,100 Implemented
WV0531 # 05 Y:2016 05 2016 INSTALL SET-BACK TIMERS $4,942 $0 Implemented
WV0531 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,891 $8,624 Implemented
WV0531 # 07 Y:2016 07 2016 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) $2,730 $2,795 Not Implemented
WV0531 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,225 $4,010 Implemented
WV0531 # 09 Y:2016 09 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $956 $1,000 Implemented
WV0531 # 10 Y:2016 10 2016 DEVELOP A REPAIR/REPLACE POLICY $256 $649 Implemented
MI0302 # 01 Y:2016 01 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $12,170 $29,740 Implemented
MI0302 # 02 Y:2016 02 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,840 $940 Implemented
MI0302 # 03 Y:2016 03 2016 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,045 $11,648 Not Implemented
MI0302 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,652 $4,744 Implemented
MI0302 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,711 $2,387 Implemented
MI0302 # 06 Y:2016 06 2016 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,171 $260 Not Implemented
MI0302 # 07 Y:2016 07 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,023 $3,200 Not Implemented
MI0302 # 08 Y:2016 08 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,335 $416 Implemented
MI0302 # 09 Y:2016 09 2016 AIR CONDITION ONLY SPACE NECESSARY $1,008 $160 Implemented
MI0302 # 10 Y:2016 10 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $521 $116 Not Implemented