IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0562 # 01 Y:2018 01 2018 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $284,971 $600,000 Not Implemented
WV0562 # 02 Y:2018 02 2018 RECOVER WASTE HEAT FROM EQUIPMENT $16,104 $80,009 Not Implemented
WV0562 # 03 Y:2018 03 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,359 $2,000 Implemented
WV0562 # 04 Y:2018 04 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $10,822 $0 Implemented
WV0562 # 05 Y:2018 05 2018 DEVELOP A REPAIR/REPLACE POLICY $6,713 $703 Implemented
WV0562 # 07 Y:2018 07 2018 MINIMIZE WATER USAGE $543 $2,100 Implemented
NL0023 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,027 $132,430 Implemented
NL0023 # 02 Y:2018 02 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,100 $0 Not Implemented
NL0023 # 03 Y:2018 03 2018 RECOVER AND REUSE WASTE MATERIAL $2,484 $7,000 Implemented
NL0023 # 04 Y:2018 04 2018 METER WASTE WATER $320 $0 Not Implemented
MI0338 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $22,077 $3,280 Not Implemented
MI0338 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,126 $12,487 Not Implemented
MI0338 # 03 Y:2018 03 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $13,231 $10,979 Not Implemented
MI0338 # 04 Y:2018 04 2018 USE SOLAR HEAT TO HEAT MAKE-UP AIR $7,395 $10,000 Not Implemented
MI0338 # 05 Y:2018 05 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,623 $12,700 Not Implemented
MI0338 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $3,272 $2,295 Not Implemented
MI0338 # 07 Y:2018 07 2018 OPTIMIZE PLANT POWER FACTOR $1,201 $3,628 Not Implemented
MI0338 # 08 Y:2018 08 2018 USE PHOTOCELL CONTROLS $1,130 $1,376 Not Implemented
LS1809 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,090 $100 Not Implemented
LS1809 # 02 Y:2018 02 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $134 $45 Not Implemented
LS1809 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $401 $300 Not Implemented
LS1809 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,902 $4,019 Not Implemented
LS1809 # 05 Y:2018 05 2018 INSULATE BARE EQUIPMENT $364 $440 Not Implemented
LS1809 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $33 $50 Not Implemented
LS1809 # 07 Y:2018 07 2018 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,145 $11,000 Not Implemented