IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0611 # 07 Y:2007 07 2007 INSULATE BARE EQUIPMENT $3,330 $3,300 Implemented
MA0611 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $888 $6,305 Not Implemented
MA0611 # 09 Y:2007 09 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $504 $3,600 Not Implemented
MA0608 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $38,346 $38,000 Not Implemented
MA0608 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,557 $91,980 Implemented
MA0608 # 03 Y:2006 03 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $20,310 $45,000 Not Implemented
MA0608 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,294 $36,000 Implemented
MA0608 # 05 Y:2006 05 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,181 $83,000 Not Implemented
MA0608 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,784 $150 Implemented
MA0608 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $1,575 $2,925 Implemented
MA0608 # 08 Y:2006 08 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $712 $1,500 Implemented
MA0606 # 01 Y:2006 01 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $617,366 $36,000 Not Implemented
MA0606 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $298,083 $2,000 Not Implemented
MA0606 # 03 Y:2006 03 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $55,708 $2,000 Not Implemented
MA0606 # 04 Y:2006 04 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $285,051 $60,000 Not Implemented
MA0606 # 05 Y:2006 05 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $169,598 $120,520 Not Implemented
MA0606 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $89,232 $165,000 Not Implemented
MA0606 # 07 Y:2006 07 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $132,608 $196,800 Not Implemented
MA0606 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $130,688 $6,000 Implemented
MA0606 # 09 Y:2006 09 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $95,360 $195,000 Not Implemented
MA0606 # 10 Y:2006 10 2006 USE OPTIMUM TEMPERATURE $79,097 $21,125 Not Implemented
MA0606 # 11 Y:2006 11 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,776 $27,573 Not Implemented
MA0606 # 12 Y:2006 12 2006 OPTIMIZE PLANT POWER FACTOR $14,940 $11,400 Not Implemented
MA0605 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $46,780 $18,225 Not Implemented
MA0605 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $17,280 $975 Implemented