Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,642
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0157 # 01 Y:2014 | 01 | 2014 | INSULATE BARE EQUIPMENT | $571 | $601 | Not Implemented |
MZ0157 # 02 Y:2014 | 02 | 2014 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $1,077 | $10,750 | Implemented |
MZ0157 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,149 | $30,133 | Implemented |
MZ0157 # 04 Y:2014 | 04 | 2014 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,223 | $17,400 | Not Implemented |
MZ0157 # 05 Y:2014 | 05 | 2014 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $3,840 | $9,600 | Implemented |
MZ0156 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,514 | $71,320 | Implemented |
MZ0156 # 02 Y:2014 | 02 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,480 | $2,000 | Implemented |
MZ0156 # 03 Y:2014 | 03 | 2014 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,460 | $400 | Implemented |
MZ0156 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,886 | $4,400 | Implemented |
MZ0156 # 05 Y:2014 | 05 | 2014 | USE OPTIMUM THICKNESS INSULATION | $9,068 | $30,128 | Implemented |
MZ0156 # 06 Y:2014 | 06 | 2014 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,337 | $676 | Not Implemented |
MZ0156 # 07 Y:2014 | 07 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $31,514 | $141,366 | Implemented |
MZ0156 # 08 Y:2014 | 08 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,299 | $10,282 | Implemented |
MZ0155 # 01 Y:2014 | 01 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,080 | $1,350 | Not Implemented |
MZ0155 # 02 Y:2014 | 02 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,171 | $1,000 | Not Implemented |
MZ0155 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,118 | $1,525 | Not Implemented |
MZ0155 # 04 Y:2014 | 04 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,228 | $750 | Not Implemented |
MZ0143 # 01 Y:2014 | 01 | 2014 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $5,306,536 | $18,000,000 | Not Implemented |
MZ0143 # 02 Y:2014 | 02 | 2014 | ELIMINATE/REDUCE AN OPERATION | $218,015 | $0 | Not Implemented |
MZ0143 # 03 Y:2014 | 03 | 2014 | INSULATE BARE EQUIPMENT | $66,528 | $339,300 | Not Implemented |
MZ0143 # 04 Y:2014 | 04 | 2014 | INSTALL EQUIPMENT TO MOVE PRODUCT | $974,644 | $3,131,120 | Not Implemented |
MZ0149 # 01 Y:2014 | 01 | 2014 | INSTALL OCCUPANCY SENSORS | $18,116 | $16,400 | Implemented |
MZ0149 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $4,128 | $6,040 | Implemented |
MZ0149 # 03 Y:2014 | 03 | 2014 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $9,091 | $25,000 | Not Implemented |
MZ0149 # 04 Y:2014 | 04 | 2014 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $6,580 | $25,750 | Not Implemented |