Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0300 # 02 Y:2002 | 02 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,790 | $616 | Implemented |
IA0300 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,088 | $381 | Implemented |
IA0300 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $762 | $3,567 | Not Implemented |
IA0300 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $834 | $1,264 | Not Implemented |
IA0300 # 06 Y:2002 | 06 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,935 | $279 | Not Implemented |
IA0300 # 07 Y:2002 | 07 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,830 | $960 | Implemented |
LM0045 # 01 Y:2002 | 01 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,878 | $5,000 | Not Implemented |
LM0045 # 02 Y:2002 | 02 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,317 | $1,000 | Not Implemented |
LM0045 # 03 Y:2002 | 03 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,903 | $0 | Implemented |
LM0045 # 04 Y:2002 | 04 | 2002 | USE EVAPORATION TO CONCENTRATE MATERIAL | $3,478 | $5,500 | Implemented |
LM0045 # 05 Y:2002 | 05 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $37,050 | $11,250 | Implemented |
LM0045 # 06 Y:2002 | 06 | 2002 | ADVERTISE PRODUCT OR SERVICE | $198,750 | $2,000 | Not Implemented |
LM0045 # 07 Y:2002 | 07 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $176,517 | $2,000 | Not Implemented |
LE0146 # 01 Y:2002 | 01 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $10,029 | $3,500 | Not Implemented |
LE0146 # 02 Y:2002 | 02 | 2002 | INSTALL OCCUPANCY SENSORS | $1,559 | $3,000 | Implemented |
LE0146 # 03 Y:2002 | 03 | 2002 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,443 | $0 | Implemented |
NC0248 # 01 Y:2002 | 01 | 2002 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $7,487 | $1,000 | Not Implemented |
NC0248 # 02 Y:2002 | 02 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,087 | $0 | Not Implemented |
NC0248 # 03 Y:2002 | 03 | 2002 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $8,379 | $7,882 | Implemented |
NC0248 # 04 Y:2002 | 04 | 2002 | DEVELOP A REPAIR/REPLACE POLICY | $2,115 | $1,075 | Implemented |
NC0248 # 05 Y:2002 | 05 | 2002 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $14,743 | $40,000 | Implemented |
NC0248 # 06 Y:2002 | 06 | 2002 | INSULATE BARE EQUIPMENT | $982 | $1,936 | Implemented |
NC0248 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $196 | $334 | Implemented |
SF0243 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,347 | $240 | Implemented |
SF0243 # 02 Y:2002 | 02 | 2002 | COVER OPEN TANKS | $10,716 | $1,500 | Not Implemented |