IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0111 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,853 $2,250 Implemented
BS0111 # 02 Y:2018 02 2018 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $768 $1,485 Implemented
BS0111 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,707 $2,970 Implemented
BS0111 # 04 Y:2018 04 2018 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $10,878 $1,225 Implemented
BS0111 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,250 $60 Implemented
BS0111 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,713 $20 Implemented
BS0111 # 07 Y:2018 07 2018 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $130,754 $100,744 Not Implemented
AM0758 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $2,830 $3,615 Not Implemented
AM0758 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,090 $5,860 Not Implemented
AM0758 # 03 Y:2018 03 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,605 $1,500 Implemented
AM0758 # 04 Y:2018 04 2018 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $730 $0 Not Implemented
AM0758 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $435 $250 Implemented
AM0758 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $485 $320 Implemented
AM0758 # 07 Y:2018 07 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $155 $50 Implemented
NL0022 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,523 $155,000 Not Implemented
NL0022 # 02 Y:2018 02 2018 INSTALL BACK-UP EQUIPMENT $4,746 $2,010 Not Implemented
NL0022 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,010 $5,620 Implemented
OK0989 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,205 $944 Not Implemented
OK0989 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $184,161 $201,131 Implemented
OK0989 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,686 $6,881 Implemented
OK0989 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,730 $13,456 Implemented
OK0989 # 05 Y:2018 05 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $616 $5,983 Not Implemented
MA0791 # 01 Y:2018 01 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $74,318 $264,000 Not Implemented
MA0791 # 02 Y:2018 02 2018 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $16,275 $1,000 Not Implemented
MA0791 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $1,313 $238 Implemented