IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0372 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,674 $120 Implemented
MI0372 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $1,658 $2,091 Not Implemented
MI0372 # 06 Y:2020 06 2020 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,113 $2,041 Not Implemented
MI0372 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,103 $21,302 Implemented
UF0550 # 01 Y:2020 01 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $41,888 $29,990 Implemented
UF0550 # 02 Y:2020 02 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $11,802 $30,000 Implemented
UF0550 # 03 Y:2020 03 2020 INSTALL TURBULATORS $3,921 $11,250 Implemented
UF0550 # 04 Y:2020 04 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,928 $2,800 Implemented
UF0550 # 05 Y:2020 05 2020 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $383,788 $897,972 Implemented
MI0370 # 01 Y:2020 01 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $15,466 $26,940 Not Implemented
MI0370 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,944 $53,621 Not Implemented
MI0370 # 03 Y:2020 03 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,446 $2,260 Not Implemented
MI0370 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $7,381 $10,120 Not Implemented
MI0370 # 05 Y:2020 05 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,983 $580 Implemented
MI0370 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,663 $120 Implemented
MI0370 # 07 Y:2020 07 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $4,066 $480 Implemented
MI0370 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,834 $1,980 Implemented
MI0370 # 09 Y:2020 09 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,780 $580 Implemented
MI0370 # 10 Y:2020 10 2020 INSTALL OCCUPANCY SENSORS $1,149 $500 Not Implemented
MI0370 # 11 Y:2020 11 2020 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $796 $134 Not Implemented
UF0549 # 01 Y:2020 01 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $737,260 $2,600,000 Not Implemented
UF0549 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $73,018 $68,138 Not Implemented
UF0549 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,001 $2,904 Implemented
UF0549 # 04 Y:2020 04 2020 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $492,292 $1,875,550 Not Implemented
UF0548 # 01 Y:2020 01 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $27,216 $0 Implemented