Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0372 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,674 | $120 | Implemented |
MI0372 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $1,658 | $2,091 | Not Implemented |
MI0372 # 06 Y:2020 | 06 | 2020 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,113 | $2,041 | Not Implemented |
MI0372 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,103 | $21,302 | Implemented |
UF0550 # 01 Y:2020 | 01 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $41,888 | $29,990 | Implemented |
UF0550 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $11,802 | $30,000 | Implemented |
UF0550 # 03 Y:2020 | 03 | 2020 | INSTALL TURBULATORS | $3,921 | $11,250 | Implemented |
UF0550 # 04 Y:2020 | 04 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,928 | $2,800 | Implemented |
UF0550 # 05 Y:2020 | 05 | 2020 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $383,788 | $897,972 | Implemented |
MI0370 # 01 Y:2020 | 01 | 2020 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $15,466 | $26,940 | Not Implemented |
MI0370 # 02 Y:2020 | 02 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,944 | $53,621 | Not Implemented |
MI0370 # 03 Y:2020 | 03 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,446 | $2,260 | Not Implemented |
MI0370 # 04 Y:2020 | 04 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $7,381 | $10,120 | Not Implemented |
MI0370 # 05 Y:2020 | 05 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,983 | $580 | Implemented |
MI0370 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,663 | $120 | Implemented |
MI0370 # 07 Y:2020 | 07 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,066 | $480 | Implemented |
MI0370 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,834 | $1,980 | Implemented |
MI0370 # 09 Y:2020 | 09 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,780 | $580 | Implemented |
MI0370 # 10 Y:2020 | 10 | 2020 | INSTALL OCCUPANCY SENSORS | $1,149 | $500 | Not Implemented |
MI0370 # 11 Y:2020 | 11 | 2020 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $796 | $134 | Not Implemented |
UF0549 # 01 Y:2020 | 01 | 2020 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $737,260 | $2,600,000 | Not Implemented |
UF0549 # 02 Y:2020 | 02 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $73,018 | $68,138 | Not Implemented |
UF0549 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,001 | $2,904 | Implemented |
UF0549 # 04 Y:2020 | 04 | 2020 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $492,292 | $1,875,550 | Not Implemented |
UF0548 # 01 Y:2020 | 01 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $27,216 | $0 | Implemented |