Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,980
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0996 # 10 Y:2019 | 10 | 2019 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $37,159 | $98,800 | Not Implemented |
UD0996 # 11 Y:2019 | 11 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $28,290 | $5,250 | Not Implemented |
UD0996 # 12 Y:2019 | 12 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,848 | $80,000 | Implemented |
WV0575 # 01 Y:2019 | 01 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,365 | $5,150 | Not Implemented |
WV0575 # 02 Y:2019 | 02 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $2,374 | $8,525 | Not Implemented |
WV0575 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,872 | $896 | Implemented |
WV0575 # 04 Y:2019 | 04 | 2019 | INSTALL SET-BACK TIMERS | $1,692 | $105 | Implemented |
WV0575 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $940 | $70 | Implemented |
WV0575 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $715 | $1,275 | Not Implemented |
WV0575 # 07 Y:2019 | 07 | 2019 | RECYCLE WHITE WATER | $674 | $2,000 | Not Implemented |
WV0575 # 08 Y:2019 | 08 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $576 | $558 | Implemented |
WV0575 # 09 Y:2019 | 09 | 2019 | MINIMIZE WATER USAGE | $510 | $1,400 | Not Implemented |
WV0574 # 01 Y:2019 | 01 | 2019 | REVISE RAW MATERIAL SPECS | $26,910 | $52,500 | Not Implemented |
WV0574 # 02 Y:2019 | 02 | 2019 | INSTALL OCCUPANCY SENSORS | $14,108 | $10,162 | Implemented |
WV0574 # 03 Y:2019 | 03 | 2019 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $9,375 | $3,276 | Not Implemented |
WV0574 # 04 Y:2019 | 04 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $9,048 | $8,000 | Not Implemented |
WV0574 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,691 | $46 | Implemented |
WV0574 # 06 Y:2019 | 06 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,235 | $0 | Implemented |
WV0574 # 07 Y:2019 | 07 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $2,811 | $540 | Implemented |
WV0574 # 08 Y:2019 | 08 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,169 | $1,725 | Implemented |
WV0574 # 09 Y:2019 | 09 | 2019 | MINIMIZE WATER USAGE | $615 | $2,100 | Not Implemented |
UD0991 # 01 Y:2019 | 01 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $16,716 | $0 | Not Implemented |
UD0991 # 02 Y:2019 | 02 | 2019 | USE POWER DURING OFF-PEAK PERIODS | $15,085 | $0 | Implemented |
UD0991 # 03 Y:2019 | 03 | 2019 | MINIMIZE WATER USAGE | $10,365 | $0 | Not Implemented |
UD0991 # 04 Y:2019 | 04 | 2019 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,066 | $0 | Not Implemented |