IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0234 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $772 $150 Implemented
ND0234 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $619 $459 Not Implemented
ND0234 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $201 $250 Implemented
ND0234 # 06 Y:1995 06 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $101 $0 Implemented
ND0234 # 07 Y:1995 07 1995 TREAT AND REUSE RINSE WATERS $27,000 $45,000 Implemented
ND0234 # 08 Y:1995 08 1995 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $7,300 $400 Implemented
ND0234 # 09 Y:1995 09 1995 USE ALTERNATIVE FLOCCULENT TO MINIMIZE SLUDGE VOLUME $650 $3,500 Implemented
IA0123 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,926 $9,325 Implemented
IA0123 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $1,494 $1,659 Not Implemented
IA0123 # 03 Y:1995 03 1995 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $764 $2,562 Implemented
IA0123 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $576 $50 Implemented
IA0123 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $465 $80 Not Implemented
IA0123 # 06 Y:1995 06 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $434 $10 Not Implemented
GT0565 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,700 $85,490 Implemented
GT0565 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,300 $5,300 Not Implemented
GT0565 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,300 $1,300 Implemented
GT0565 # 04 Y:1995 04 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,100 $8,480 Not Implemented
GT0565 # 05 Y:1995 05 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $8,570 $750 Implemented
GT0565 # 06 Y:1995 06 1995 USE SYNTHETIC LUBRICANT $3,350 $0 Not Implemented
GT0565 # 07 Y:1995 07 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,770 $320 Implemented
GT0565 # 08 Y:1995 08 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $8,960 $31,380 Implemented
GT0565 # 09 Y:1995 09 1995 UPGRADE CONTROLS ON COMPRESSORS $25,500 $6,300 Not Implemented
GT0565 # 10 Y:1995 10 1995 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $272,800 $20,800 Not Implemented
UM0039 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,253 $655 Implemented
UM0039 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $555 $1,453 Implemented