IAC logo
IAC Assessment: GT0565
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0565
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1995
Principal Product Recreational Vehicles
NAICS n/a
SIC 3799 - Transportation Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 621,100
Annual Production 50,000 Pieces
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,222,210 23,038,687 kWh $0.05
Natural Gas $208,557 66,269 MMBtu $3.15
TOTAL ENERGY COSTS $1,505,767
RECOMMENDED SAVINGS* $358,350 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,300
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$10,700
Cost:
$85,490
$10,700 218,347 - - - - $10,700
218,347
kWh
-
-
MMBtu
-
-
lb
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$10,300
Cost:
$5,300
$10,300 213,951 - - - - $10,300
213,951
kWh
-
-
MMBtu
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,300
Cost:
$1,300
$4,300 90,270 - - - - $4,300
90,270
kWh
-
-
MMBtu
-
-
lb
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$10,100
Cost:
$8,480
$10,100 212,485 - - - - $10,100
212,485
kWh
-
-
MMBtu
-
-
lb
05: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$8,570
Cost:
$750
- - $8,570 2,720 - - -
-
kWh
$8,570
2,720
MMBtu
-
-
lb
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$3,350
Cost:
-
$3,350 55,686 - - - - $3,350
55,686
kWh
-
-
MMBtu
-
-
lb
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,770
Cost:
$320
$3,770 63,013 - - - - $3,770
63,013
kWh
-
-
MMBtu
-
-
lb
08: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$8,960
Cost:
$31,380
$8,960 187,866 - - - - $8,960
187,866
kWh
-
-
MMBtu
-
-
lb
09: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$25,500
Cost:
$6,300
$25,500 533,411 - - - - $25,500
533,411
kWh
-
-
MMBtu
-
-
lb
10: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$272,800
Cost:
$20,800
- - - - $272,800 70,850 -
-
kWh
-
-
MMBtu
$272,800
70,850
lb
TOTAL RECOMMENDED Savings:
$358,350
Cost:
$160,120
$76,980 1,575,029 $8,570 2,720 $272,800 70,850 $76,980
1,575,029
kWh
$8,570
2,720
MMBtu
$272,800
70,850
lb
TOTAL IMPLEMENTED Savings:
$36,300
Cost:
$119,240
$27,730 559,496 $8,570 2,720 - - $27,730
559,496
kWh
$8,570
2,720
MMBtu
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)