Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0681 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,840 | $700 | Not Implemented |
UD0681 # 06 Y:2003 | 06 | 2003 | REDUCE VENTILATION AIR | $2,785 | $1,360 | Not Implemented |
UD0681 # 07 Y:2003 | 07 | 2003 | AIR CONDITION ONLY SPACE NECESSARY | $1,800 | $0 | Implemented |
UD0681 # 08 Y:2003 | 08 | 2003 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $1,740 | $0 | Implemented |
UD0681 # 09 Y:2003 | 09 | 2003 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,095 | $1,268 | Not Implemented |
UD0681 # 10 Y:2003 | 10 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,095 | $91 | Not Implemented |
UD0681 # 11 Y:2003 | 11 | 2003 | INSULATE BARE EQUIPMENT | $930 | $1,360 | Implemented |
UD0681 # 12 Y:2003 | 12 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $350 | $230 | Not Implemented |
UD0681 # 13 Y:2003 | 13 | 2003 | DISCONNECT BALLASTS | $159 | $46 | Implemented |
UD0681 # 14 Y:2003 | 14 | 2003 | INSTALL OCCUPANCY SENSORS | $105 | $160 | Not Implemented |
UF0331 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,357 | $18,567 | Implemented |
UF0331 # 02 Y:2003 | 02 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,423 | $0 | Implemented |
UF0331 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,837 | $11,405 | Implemented |
UF0331 # 04 Y:2003 | 04 | 2003 | ADD AREA LIGHTING SWITCHES | $924 | $1,649 | Implemented |
UF0331 # 05 Y:2003 | 05 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,190 | $32,481 | Implemented |
UF0331 # 06 Y:2003 | 06 | 2003 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $14,275 | $55,800 | Not Implemented |
UF0331 # 07 Y:2003 | 07 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $907 | $0 | Implemented |
UF0331 # 08 Y:2003 | 08 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $7,000 | $3,000 | Implemented |
UF0331 # 09 Y:2003 | 09 | 2003 | MOVE PRODUCT USING MECHANICAL MEANS | $2,340 | $2,372 | Implemented |
WI0452 # 01 Y:2003 | 01 | 2003 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $54,337 | $72,000 | n/a |
WI0452 # 02 Y:2003 | 02 | 2003 | BURN WASTE OIL FOR HEAT | $44,636 | $30,000 | Not Implemented |
WI0452 # 03 Y:2003 | 03 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $5,692 | $12,000 | Not Implemented |
WI0452 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $4,850 | $2,700 | Not Implemented |
WI0452 # 05 Y:2003 | 05 | 2003 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $4,710 | $0 | Not Implemented |
WI0452 # 06 Y:2003 | 06 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $4,063 | $1,000 | Not Implemented |