IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0623 # 05 Y:2009 05 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $1,850 $17,500 Not Implemented
UD0802 # 01 Y:2009 01 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $13,072 $16,185 Not Implemented
UD0802 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,384 $29,087 Implemented
UD0802 # 03 Y:2009 03 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,645 $0 Implemented
UD0802 # 04 Y:2009 04 2009 INSTALL AUTOMATIC STACK DAMPER $3,637 $1,000 Not Implemented
UD0802 # 05 Y:2009 05 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,711 $6,468 Not Implemented
UD0802 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,230 $1,500 Implemented
UD0802 # 07 Y:2009 07 2009 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,084 $2,812 Not Implemented
UD0802 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $797 $1,907 Implemented
UD0802 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $487 $2,374 Implemented
UD0802 # 10 Y:2009 10 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,334 $1,000 Implemented
UD0802 # 11 Y:2009 11 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $194 $0 Not Implemented
SF0377 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,324 $0 Implemented
SF0377 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $1,657 $1,518 Not Implemented
SF0377 # 03 Y:2009 03 2009 USE RADIANT HEATER FOR SPOT HEATING $1,094 $2,088 Not Implemented
SF0377 # 04 Y:2009 04 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $209 $587 Not Implemented
SF0377 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $977 $4,281 Not Implemented
SF0377 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,529 $30,407 Not Implemented
SF0377 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,453 $38,867 Not Implemented
SF0377 # 08 Y:2009 08 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,116 $25,320 Not Implemented
OR0546 # 01 Y:2009 01 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,000 $350 Not Implemented
OR0546 # 02 Y:2009 02 2009 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $24,190 $17,000 Not Implemented
OR0546 # 03 Y:2009 03 2009 OPTIMIZE PLANT POWER FACTOR $7,200 $10,500 Not Implemented
OR0546 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $4,087 $7,170 Not Implemented
OR0546 # 05 Y:2009 05 2009 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $3,220 $6,680 Not Implemented