Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,703
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0522 # 02 Y:2014 | 02 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,436 | $5,000 | Not Implemented |
NC0522 # 03 Y:2014 | 03 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,823 | $1,500 | Implemented |
NC0522 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,016 | $3,500 | Not Implemented |
NC0522 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $207 | $100 | Implemented |
NC0522 # 06 Y:2014 | 06 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $472 | $320 | Not Implemented |
NC0522 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $439 | $309 | Implemented |
NC0522 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $797 | $208 | Implemented |
NC0522 # 09 Y:2014 | 09 | 2014 | INSTALL OCCUPANCY SENSORS | $455 | $400 | Not Implemented |
NC0522 # 10 Y:2014 | 10 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $1,616 | $4,256 | Not Implemented |
NC0522 # 11 Y:2014 | 11 | 2014 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $971 | $3,500 | Implemented |
SU0366 # 01 Y:2014 | 01 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $368 | $0 | Not Implemented |
SU0366 # 02 Y:2014 | 02 | 2014 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $25,532 | $4,550 | Not Implemented |
SU0366 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $14,414 | $2,369 | Not Implemented |
SU0366 # 04 Y:2014 | 04 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,336 | $762 | Not Implemented |
SU0366 # 05 Y:2014 | 05 | 2014 | ELIMINATE/REDUCE AN OPERATION | $3,947 | $2,284 | Not Implemented |
SU0366 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,714 | $1,131 | Not Implemented |
BS0040 # 01 Y:2014 | 01 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,421 | $2,496 | Not Implemented |
BS0040 # 02 Y:2014 | 02 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,977 | $470 | Not Implemented |
BS0040 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $887 | $2,075 | Implemented |
BS0040 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $500 | $722 | Implemented |
BS0040 # 05 Y:2014 | 05 | 2014 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $316 | $464 | Not Implemented |
BS0040 # 06 Y:2014 | 06 | 2014 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $232 | $221 | Not Implemented |
BS0040 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $610 | $360 | Not Implemented |
BS0040 # 08 Y:2014 | 08 | 2014 | AIR CONDITION ONLY SPACE NECESSARY | $122 | $95 | Not Implemented |
BS0040 # 09 Y:2014 | 09 | 2014 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $51 | $119 | Not Implemented |