IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,553

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0282 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $6,041 $1,622 Implemented
MA0282 # 04 Y:1993 04 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,625 $2,854 Implemented
MA0282 # 05 Y:1993 05 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,721 $0 Not Implemented
MA0282 # 06 Y:1993 06 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $475 $0 Implemented
MA0282 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $430 $230 Implemented
MA0282 # 08 Y:1993 08 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $235 $247 Not Implemented
MA0277 # 01 Y:1993 01 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,298 $39,650 Implemented
MA0277 # 02 Y:1993 02 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,123 $3,800 Implemented
MA0277 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,443 $5,557 Implemented
MA0277 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,397 $91 Implemented
MA0277 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $784 $180 Implemented
MA0277 # 06 Y:1993 06 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $550 $126 Not Implemented
MA0274 # 01 Y:1993 01 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $9,079 $2,733 Not Implemented
MA0274 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,949 $125 Not Implemented
MA0274 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $853 $0 Not Implemented
MA0274 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $585 $91 Not Implemented
MA0274 # 05 Y:1993 05 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $687 $169 Not Implemented
MA0273 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $35,663 $30,400 Implemented
MA0273 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,496 $22,778 Not Implemented
MA0273 # 03 Y:1993 03 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,038 $0 Not Implemented
MA0273 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $884 $712 Not Implemented
MA0273 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $520 $120 Implemented
MA0273 # 06 Y:1993 06 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $26 $6 Implemented
MA0263 # 01 Y:1993 01 1993 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $2,400 $120 Implemented
MA0263 # 02 Y:1993 02 1993 RECOVER WASTE HEAT FROM EQUIPMENT $838 $1,562 Implemented