Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,553
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0282 # 03 Y:1993 | 03 | 1993 | INSULATE BARE EQUIPMENT | $6,041 | $1,622 | Implemented |
MA0282 # 04 Y:1993 | 04 | 1993 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,625 | $2,854 | Implemented |
MA0282 # 05 Y:1993 | 05 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,721 | $0 | Not Implemented |
MA0282 # 06 Y:1993 | 06 | 1993 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $475 | $0 | Implemented |
MA0282 # 07 Y:1993 | 07 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $430 | $230 | Implemented |
MA0282 # 08 Y:1993 | 08 | 1993 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $235 | $247 | Not Implemented |
MA0277 # 01 Y:1993 | 01 | 1993 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,298 | $39,650 | Implemented |
MA0277 # 02 Y:1993 | 02 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,123 | $3,800 | Implemented |
MA0277 # 03 Y:1993 | 03 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,443 | $5,557 | Implemented |
MA0277 # 04 Y:1993 | 04 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,397 | $91 | Implemented |
MA0277 # 05 Y:1993 | 05 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $784 | $180 | Implemented |
MA0277 # 06 Y:1993 | 06 | 1993 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $550 | $126 | Not Implemented |
MA0274 # 01 Y:1993 | 01 | 1993 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $9,079 | $2,733 | Not Implemented |
MA0274 # 02 Y:1993 | 02 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,949 | $125 | Not Implemented |
MA0274 # 03 Y:1993 | 03 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $853 | $0 | Not Implemented |
MA0274 # 04 Y:1993 | 04 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $585 | $91 | Not Implemented |
MA0274 # 05 Y:1993 | 05 | 1993 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $687 | $169 | Not Implemented |
MA0273 # 01 Y:1993 | 01 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $35,663 | $30,400 | Implemented |
MA0273 # 02 Y:1993 | 02 | 1993 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,496 | $22,778 | Not Implemented |
MA0273 # 03 Y:1993 | 03 | 1993 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,038 | $0 | Not Implemented |
MA0273 # 04 Y:1993 | 04 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $884 | $712 | Not Implemented |
MA0273 # 05 Y:1993 | 05 | 1993 | INSULATE BARE EQUIPMENT | $520 | $120 | Implemented |
MA0273 # 06 Y:1993 | 06 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $26 | $6 | Implemented |
MA0263 # 01 Y:1993 | 01 | 1993 | SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS | $2,400 | $120 | Implemented |
MA0263 # 02 Y:1993 | 02 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $838 | $1,562 | Implemented |