IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,682

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0451 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,173 $20 Not Implemented
BD0451 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $783 $100 Not Implemented
BD0451 # 09 Y:2014 09 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,993 $875 Not Implemented
BD0451 # 10 Y:2014 10 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,470 $600 Not Implemented
BD0451 # 11 Y:2014 11 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,720 $560 Not Implemented
BD0451 # 12 Y:2014 12 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $364 $20 Not Implemented
BD0451 # 13 Y:2014 13 2014 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $13,000 $2,000 Not Implemented
BD0450 # 01 Y:2014 01 2014 USE RADIANT HEATER FOR SPOT HEATING $19,966 $27,000 Not Implemented
BD0450 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,234 $24,940 Not Implemented
BD0450 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,837 $1,000 Implemented
BD0450 # 04 Y:2014 04 2014 UPGRADE OBSOLETE EQUIPMENT $2,486 $20 Implemented
BD0450 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,148 $2,850 Implemented
BD0450 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,909 $1,025 Not Implemented
BD0450 # 07 Y:2014 07 2014 USE PHOTOCELL CONTROLS $777 $450 Not Implemented
BD0450 # 08 Y:2014 08 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $461 $320 Not Implemented
BD0450 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $406 $750 Not Implemented
BD0450 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $322 $143 Not Implemented
BD0449 # 01 Y:2014 01 2014 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $64,237 $1,500,000 Implemented
BD0449 # 02 Y:2014 02 2014 USE RADIANT HEATER FOR SPOT HEATING $13,551 $16,500 Not Implemented
BD0449 # 03 Y:2014 03 2014 USE PHOTOCELL CONTROLS $12,784 $7,575 Implemented
BD0449 # 04 Y:2014 04 2014 DISCONNECT BALLASTS $9,963 $725 Not Implemented
BD0449 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $3,233 $750 Not Implemented
BD0449 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,491 $20 Implemented
BD0449 # 07 Y:2014 07 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,288 $40 Not Implemented
BD0449 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,827 $2,800 Implemented