IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0865 # 05 Y:2012 05 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,071 $1,500 Not Implemented
UD0865 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $992 $1,000 Not Implemented
UD0865 # 07 Y:2012 07 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $966 $1,600 Not Implemented
UD0865 # 08 Y:2012 08 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,463 $0 Not Implemented
UD0865 # 09 Y:2012 09 2012 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $4,015 $9,000 Not Implemented
UD0865 # 10 Y:2012 10 2012 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $3,073 $9,219 Not Implemented
UD0865 # 11 Y:2012 11 2012 RECOVER WASTE HEAT FROM EQUIPMENT $42,877 $83,500 Not Implemented
UD0865 # 12 Y:2012 12 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $20,832 $25,000 Not Implemented
UD0865 # 13 Y:2012 13 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $15,846 $24,600 Not Implemented
UD0865 # 14 Y:2012 14 2012 AVOID FROST FORMATION ON EVAPORATORS $7,322 $0 Not Implemented
UD0865 # 15 Y:2012 15 2012 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $14,957 $123,000 Not Implemented
MA0700 # 01 Y:2012 01 2012 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $16,572 $12,830 Not Implemented
MA0700 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,586 $24,280 Implemented
MA0700 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $3,503 $500 Implemented
MA0700 # 04 Y:2012 04 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,265 $500 Implemented
MA0700 # 05 Y:2012 05 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,934 $500 Implemented
MA0700 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $1,148 $500 Implemented
MA0700 # 07 Y:2012 07 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $913 $500 Implemented
OK0833 # 01 Y:2012 01 2012 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,700 $5,000 Implemented
OK0833 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $4,000 $2,000 Not Implemented
OK0833 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $1,600 $2,500 Not Implemented
OK0833 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,000 $500 Implemented
OK0833 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,800 $4,050 Not Implemented
OK0833 # 06 Y:2012 06 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,900 $14,000 Not Implemented
OK0833 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,150 $24,000 Not Implemented