Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,295
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0609 # 01 Y:2021 | 01 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,886 | $1,396 | Not Implemented |
SD0609 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $821 | $0 | Not Implemented |
SD0609 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,053 | $225 | Not Implemented |
SD0609 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,216 | $2,319 | Not Implemented |
SD0609 # 05 Y:2021 | 05 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $308 | $920 | Not Implemented |
DL0194 # 01 Y:2021 | 01 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,325 | $475 | Implemented |
DL0194 # 02 Y:2021 | 02 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $52,057 | $15,000 | Not Implemented |
DL0194 # 03 Y:2021 | 03 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,097 | $1,527 | Implemented |
DL0194 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,663 | $1,698 | Implemented |
DL0194 # 05 Y:2021 | 05 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $3,230 | $13,750 | Implemented |
DL0194 # 06 Y:2021 | 06 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,000 | $114 | Not Implemented |
MI0389 # 01 Y:2021 | 01 | 2021 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $48,176 | $80 | Not Implemented |
MI0389 # 02 Y:2021 | 02 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $43,876 | $480 | Implemented |
MI0389 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,739 | $33,655 | Implemented |
MI0389 # 04 Y:2021 | 04 | 2021 | INSTALL EFFICIENT RECTIFIERS | $21,196 | $55,920 | Implemented |
MI0389 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,025 | $120 | Implemented |
MI0389 # 06 Y:2021 | 06 | 2021 | INSULATE BARE EQUIPMENT | $15,421 | $6,812 | Not Implemented |
MI0389 # 07 Y:2021 | 07 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,000 | $480 | Not Implemented |
MI0389 # 08 Y:2021 | 08 | 2021 | USE COMPRESSOR AIR FILTERS | $1,420 | $1,100 | Implemented |
MI0389 # 09 Y:2021 | 09 | 2021 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,362 | $616 | Implemented |
MI0389 # 10 Y:2021 | 10 | 2021 | COMBINE UTILITY METERS | $776 | $240 | Not Implemented |
UF0565 # 01 Y:2021 | 01 | 2021 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $124,268 | $90,000 | Not Implemented |
UF0565 # 02 Y:2021 | 02 | 2021 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $120,536 | $84,600 | Not Implemented |
UF0565 # 03 Y:2021 | 03 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $52,797 | $9,223 | Not Implemented |
UF0565 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,569 | $48,945 | Implemented |