Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
146,354
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0544 # 10 Y:2017 | 10 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $4,065 | $1,108 | Implemented |
WV0544 # 11 Y:2017 | 11 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $3,967 | $15,395 | Not Implemented |
WV0544 # 12 Y:2017 | 12 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,588 | $2,000 | Implemented |
WV0544 # 13 Y:2017 | 13 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,526 | $732 | Implemented |
WV0544 # 14 Y:2017 | 14 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,358 | $3,438 | Not Implemented |
WV0544 # 15 Y:2017 | 15 | 2017 | INSULATE BARE EQUIPMENT | $268 | $876 | Not Implemented |
SF0501 # 01 Y:2017 | 01 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,520 | $0 | Implemented |
SF0501 # 02 Y:2017 | 02 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,047 | $0 | Not Implemented |
SF0501 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $777 | $84 | Not Implemented |
SF0501 # 04 Y:2017 | 04 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,074 | $1,769 | Implemented |
SF0501 # 05 Y:2017 | 05 | 2017 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $2,356 | $1,821 | Not Implemented |
SF0501 # 06 Y:2017 | 06 | 2017 | USE SOLAR HEAT TO MAKE ELECTRICTY | $147,360 | $665,154 | Not Implemented |
UA0179 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $53,482 | $100,000 | Not Implemented |
UA0179 # 02 Y:2017 | 02 | 2017 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $44,167 | $500 | Not Implemented |
UA0179 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,876 | $42,452 | Not Implemented |
UA0179 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,851 | $250 | Implemented |
UA0179 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,243 | $1,165 | Implemented |
UA0179 # 06 Y:2017 | 06 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,934 | $6,152 | Not Implemented |
UA0179 # 07 Y:2017 | 07 | 2017 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,673 | $7,500 | Not Implemented |
UA0179 # 08 Y:2017 | 08 | 2017 | INSULATE BARE EQUIPMENT | $429 | $247 | Implemented |
UA0179 # 09 Y:2017 | 09 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,242 | $1,015 | Implemented |
UD0966 # 01 Y:2017 | 01 | 2017 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $217,648 | $48,962 | Not Implemented |
UD0966 # 02 Y:2017 | 02 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $12,245 | $25,000 | Not Implemented |
UD0966 # 03 Y:2017 | 03 | 2017 | IMPROVE COMBUSTION CONTROL CAPABILITY | $270,579 | $100,000 | Not Implemented |
UD0966 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,225 | $4,000 | Not Implemented |