IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0141 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,518 $21,850 Implemented
MZ0141 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $10,446 $1,875 Not Implemented
MZ0141 # 08 Y:2014 08 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,940 $0 Implemented
MZ0139 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $11,156 $7,200 Implemented
MZ0139 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,028 $38,640 Implemented
MZ0139 # 03 Y:2014 03 2014 USE PHOTOCELL CONTROLS $4,586 $2,450 Implemented
MZ0139 # 04 Y:2014 04 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,499 $0 Not Implemented
MZ0139 # 05 Y:2014 05 2014 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,210 $0 Implemented
MZ0139 # 06 Y:2014 06 2014 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $60,368 $50,000 Implemented
MZ0139 # 07 Y:2014 07 2014 CONDENSE OPERATION INTO ONE BUILDING $16,179 $85,000 Implemented
MZ0139 # 08 Y:2014 08 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,370 $40,000 Not Implemented
MZ0138 # 01 Y:2014 01 2014 INSULATE BARE EQUIPMENT $871 $620 Not Implemented
MZ0138 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $557 $1,075 Implemented
MZ0138 # 03 Y:2014 03 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,006 $15,000 Not Implemented
MZ0138 # 04 Y:2014 04 2014 AIR CONDITION ONLY SPACE NECESSARY $3,570 $0 Not Implemented
MZ0138 # 05 Y:2014 05 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $358 $0 Implemented
MZ0135 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $106,262 $234,417 Not Implemented
MZ0135 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $89,370 $25,944 Implemented
MZ0135 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $27,410 $1,821 Implemented
MZ0135 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,968 $1,420 Not Implemented
MZ0135 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,434 $1,174 Implemented
MZ0135 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,201 $2,376 Not Implemented
MZ0135 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $722 $1,436 Not Implemented
MZ0135 # 08 Y:2014 08 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $688 $200 Implemented
MZ0135 # 09 Y:2014 09 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $552 $409 Not Implemented