IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

11,865

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0608 # 04 Y:2021 04 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,201 $6,200 Not Implemented
SD0608 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,225 $143 Not Implemented
SD0608 # 06 Y:2021 06 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $544 $1,695 Not Implemented
SF0569 # 01 Y:2021 01 2021 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $5,931 $0 Implemented
SF0569 # 02 Y:2021 02 2021 INSTALL TIMERS AND/OR THERMOSTATS $4,698 $3,740 Implemented
SF0569 # 03 Y:2021 03 2021 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $5,693 $9,138 Implemented
SF0569 # 04 Y:2021 04 2021 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $7,674 $23,650 Implemented
SF0569 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $2,279 $6,956 Implemented
SF0569 # 06 Y:2021 06 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $107,546 $722,227 Implemented
SF0569 # 07 Y:2021 07 2021 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $143,550 $77,720 Implemented
SD0607 # 01 Y:2021 01 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $26,888 $500 Not Implemented
SD0607 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,809 $38,800 Not Implemented
SD0607 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,885 $2,100 Not Implemented
SD0607 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,753 $568 Not Implemented
SD0607 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,289 $2,741 Not Implemented
SD0607 # 06 Y:2021 06 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $794 $760 Not Implemented
SD0607 # 07 Y:2021 07 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $481 $706 Not Implemented
SD0607 # 08 Y:2021 08 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $487 $540 Not Implemented
SF0568 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $40,609 $0 Not Implemented
SF0568 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,914 $0 Implemented
SF0568 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,183 $400 Not Implemented
SF0568 # 04 Y:2021 04 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,048 $860 Implemented
SF0568 # 05 Y:2021 05 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $26,520 $43,936 Not Implemented
SF0568 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,828 $70,690 Implemented
SF0567 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $20,821 $0 Not Implemented