IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,998

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0069 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,724 $0 Implemented
ST0069 # 02 Y:1986 02 1986 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $604 $150 Implemented
ST0069 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,893 $269 Implemented
ST0069 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,839 $792 Implemented
ST0069 # 05 Y:1986 05 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $985 $2,700 Implemented
ST0069 # 06 Y:1986 06 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $164 $0 Not Implemented
ST0069 # 07 Y:1986 07 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $225 $400 Not Implemented
ST0069 # 08 Y:1986 08 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $587 $1,750 Implemented
ST0069 # 09 Y:1986 09 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $774 $470 Implemented
ST0069 # 10 Y:1986 10 1986 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $17,145 $35,714 Not Implemented
ST0069 # 11 Y:1986 11 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $342 $268 Implemented
TN0279 # 01 Y:1986 01 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,106 $39,200 Not Implemented
TN0279 # 02 Y:1986 02 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,570 $4,000 Not Implemented
TN0279 # 03 Y:1986 03 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,285 $0 Not Implemented
TN0279 # 04 Y:1986 04 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,223 $0 Not Implemented
TN0279 # 05 Y:1986 05 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,339 $0 Implemented
TN0279 # 06 Y:1986 06 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,298 $648 Not Implemented
CO0065 # 09 Y:1986 09 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $697 $300 Implemented
CO0065 # 10 Y:1986 10 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $522 $760 Not Implemented
CO0065 # 11 Y:1986 11 1986 INSTALL TIMERS AND/OR THERMOSTATS $521 $85 Implemented
CO0065 # 12 Y:1986 12 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,951 $1,328 Implemented
GT0290 # 01 Y:1986 01 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,798 $12,000 Implemented
GT0290 # 02 Y:1986 02 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $636 $0 Implemented
GT0290 # 03 Y:1986 03 1986 IMPROVE LUBRICATION PRACTICES $185 $64 Implemented
GT0291 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,434 $500 Implemented