IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0394 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $16,584 $15,900 Not Implemented
IA0394 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $25,628 $15,200 Not Implemented
IA0394 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $2,083 $1,969 Not Implemented
UF0387 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $1,545 $2,803 Implemented
UF0387 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,561 $2,190 Implemented
UF0387 # 03 Y:2006 03 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $7,957 $0 Not Implemented
UF0387 # 04 Y:2006 04 2006 AIR CONDITION ONLY SPACE NECESSARY $2,639 $3,360 Not Implemented
UF0387 # 05 Y:2006 05 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $4,265 $578 Not Implemented
UF0387 # 06 Y:2006 06 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,577 $370 Implemented
UF0387 # 07 Y:2006 07 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $21,479 $0 Implemented
UF0387 # 08 Y:2006 08 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,017 $0 Implemented
UF0387 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,106 $6,458 Implemented
UF0387 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $209 $140 Not Implemented
UM0308 # 01 Y:2006 01 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $3,769 $500 Implemented
UM0308 # 02 Y:2006 02 2006 REDUCE VENTILATION AIR $2,507 $500 Implemented
UM0308 # 03 Y:2006 03 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,070 $1,250 Not Implemented
UM0308 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,462 $3,479 Not Implemented
UM0308 # 05 Y:2006 05 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $536 $300 Implemented
UM0308 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $392 $1,000 Implemented
UM0308 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $142 $310 Not Implemented
WI0521 # 01 Y:2006 01 2006 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $222,888 $230,600 Not Implemented
WI0521 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,408 $13,600 Not Implemented
WI0521 # 03 Y:2006 03 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,900 $18,000 Not Implemented
WI0521 # 04 Y:2006 04 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,386 $11,000 Not Implemented
WI0521 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,630 $3,200 Not Implemented