IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0173 # 05 Y:2010 05 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $310 $150 Not Implemented
IC0173 # 06 Y:2010 06 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,982 $5,951 Not Implemented
IC0173 # 07 Y:2010 07 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,649 $3,267 Not Implemented
IC0173 # 08 Y:2010 08 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $281 $0 Not Implemented
IC0173 # 09 Y:2010 09 2010 UPGRADE CONTROLS ON COMPRESSORS $5,015 $0 Not Implemented
IC0173 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $287 $610 Not Implemented
IC0173 # 11 Y:2010 11 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $146 $0 Not Implemented
SF0389 # 01 Y:2010 01 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,049 $400 Implemented
SF0389 # 02 Y:2010 02 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $255 $31 Implemented
SF0389 # 03 Y:2010 03 2010 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $6,873 $2,392 Implemented
SF0389 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $953 $672 Implemented
SF0389 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,157 $2,712 Implemented
SF0389 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $4,881 $7,273 Implemented
SF0389 # 07 Y:2010 07 2010 USE PHOTOCELL CONTROLS $11,135 $19,068 Implemented
SF0389 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,881 $9,823 Implemented
SF0389 # 09 Y:2010 09 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,274 $8,179 Implemented
SF0389 # 10 Y:2010 10 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,037 $9,053 Implemented
SF0389 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $812 $7,156 Implemented
GT0874 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,133 $1,250 Implemented
GT0874 # 02 Y:2010 02 2010 USE SYNTHETIC LUBRICANT $1,632 $0 Not Implemented
GT0874 # 03 Y:2010 03 2010 USE OPTIMUM THICKNESS INSULATION $53,185 $6,187 Not Implemented
GT0874 # 04 Y:2010 04 2010 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,159 $2,883 Implemented
GT0874 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,038 $20,250 Not Implemented
GT0874 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,115 $38,366 Not Implemented
GT0874 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,744 $119,989 Implemented