Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0627 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,402 | $72,000 | n/a |
UF0627 # 03 Y:2025 | 03 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $8,759 | $32,640 | n/a |
UF0627 # 04 Y:2025 | 04 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,567 | $9,248 | n/a |
UF0627 # 05 Y:2025 | 05 | 2025 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $3,491 | $0 | n/a |
UF0627 # 06 Y:2025 | 06 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $1,094 | $2,000 | n/a |
UF0627 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,019 | $2,949 | n/a |
UF0627 # 08 Y:2025 | 08 | 2025 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $41,600 | $98,000 | n/a |
CI0048 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $54,215 | $280,743 | n/a |
CI0048 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,034 | $1,595 | n/a |
CI0048 # 03 Y:2025 | 03 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,546 | $32,000 | n/a |
CI0048 # 04 Y:2025 | 04 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $5,329 | $2,160 | n/a |
CI0048 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $4,884 | $3,750 | n/a |
CI0048 # 06 Y:2025 | 06 | 2025 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,445 | $1,536 | n/a |
CI0048 # 07 Y:2025 | 07 | 2025 | USE PHOTOCELL CONTROLS | $2,640 | $2,150 | n/a |
CI0048 # 08 Y:2025 | 08 | 2025 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $2,170 | $18,100 | n/a |
LE0596 # 01 Y:2025 | 01 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $7,008 | $2,000 | n/a |
LE0596 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,874 | $2,600 | n/a |
LE0596 # 03 Y:2025 | 03 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $26,110 | $14,500 | n/a |
LE0596 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,210 | $8,000 | n/a |
LE0596 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,423 | $5,658 | n/a |
LE0596 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $702 | $660 | n/a |
LE0596 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,044 | $45,000 | n/a |
LE0596 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,365 | $24,074 | n/a |
LE0596 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,935 | $14,078 | n/a |
LE0596 # 10 Y:2025 | 10 | 2025 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $90,409 | $240,000 | n/a |