IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122,146

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0178 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,705 $0 Not Implemented
KU0178 # 06 Y:1985 06 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,397 $2,000 Implemented
KU0178 # 07 Y:1985 07 1985 INSULATE BARE EQUIPMENT $2,651 $1,952 Implemented
KU0178 # 08 Y:1985 08 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $2,912 $0 Not Implemented
KU0178 # 09 Y:1985 09 1985 INSTALL AUTOMATIC STACK DAMPER $2,256 $1,600 Not Implemented
KU0178 # 10 Y:1985 10 1985 INSULATE BARE EQUIPMENT $698 $1,500 Not Implemented
KU0178 # 11 Y:1985 11 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $423 $50 Implemented
KU0178 # 12 Y:1985 12 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $423 $215 Not Implemented
KU0178 # 13 Y:1985 13 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $360 $120 Implemented
KU0178 # 14 Y:1985 14 1985 IMPROVE LUBRICATION PRACTICES $466 $250 Not Implemented
KU0178 # 15 Y:1985 15 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $498 $200 Implemented
KU0178 # 16 Y:1985 16 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $446 $0 Implemented
KU0178 # 17 Y:1985 17 1985 INSULATE BARE EQUIPMENT $192 $75 Not Implemented
TS0026 # 01 Y:1985 01 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,637 $3,240 Not Implemented
TS0026 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $325 $460 Not Implemented
TS0026 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,640 $503 Not Implemented
TS0026 # 04 Y:1985 04 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,372 $400 Not Implemented
TS0027 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $216 Not Implemented
TS0027 # 02 Y:1985 02 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,348 $3,929 Not Implemented
TS0027 # 03 Y:1985 03 1985 INSTALL STORM WINDOWS AND DOORS $916 $1,275 Not Implemented
TS0027 # 04 Y:1985 04 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $555 $500 Not Implemented
TS0027 # 05 Y:1985 05 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,684 $0 Not Implemented
TS0027 # 06 Y:1985 06 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $104 $0 Not Implemented
UD0171 # 01 Y:1985 01 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,352 $4,773 Implemented
UD0171 # 02 Y:1985 02 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,014 $17,000 Implemented