IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0987 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,729 $13,500 Not Implemented
UD0987 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,292 $8,675 Not Implemented
UD0987 # 07 Y:2018 07 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,160 $30,000 Not Implemented
UD0987 # 08 Y:2018 08 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,933 $40,500 Not Implemented
UD0986 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,962 $2,000 Not Implemented
UD0986 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,246 $2,080 Not Implemented
UD0986 # 08 Y:2018 08 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $353 $50 Not Implemented
UD0986 # 09 Y:2018 09 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $193 $500 Not Implemented
UD0986 # 10 Y:2018 10 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,539 $17,808 Not Implemented
UD0986 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $28,289 $0 Not Implemented
UD0986 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,337 $0 Not Implemented
UD0986 # 03 Y:2018 03 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $37,147 $0 Not Implemented
UD0986 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $467 $0 Not Implemented
UD0986 # 05 Y:2018 05 2018 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $455 $0 Not Implemented
UD0985 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,113 $0 Implemented
UD0985 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,260 $1,000 Implemented
UD0985 # 03 Y:2018 03 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $957 $2,500 Implemented
UD0985 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $938 $0 Not Implemented
UD0985 # 05 Y:2018 05 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $320 $1,500 Not Implemented
UD0985 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,998 $55,816 Implemented
UD0985 # 07 Y:2018 07 2018 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $30,420 $25,000 Implemented
UD0984 # 01 Y:2018 01 2018 USE OPTIMUM THICKNESS INSULATION $2,053 $50 Not Implemented
UD0984 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,981 $14,930 Implemented
UD0984 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,566 $1,500 Implemented
UD0984 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $852 $750 Implemented